Web Analytics Made Easy - StatCounter

Track Link Assembly Tenders

Get complete information related to latest Track Link Assembly Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Track Link Assembly Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Track Link Assembly Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43607656 Due date: 23 Jan, 202623 Jan, 2026 NA
Tender For supply of set of earthing cable for vb trainset consists of -: (1) earthing cable for bogie frame-1 qty.-02 nos. (2) earthing cable for bogie frame-2 qty.-02 nos. (3) earthing cable for axle 2 to bog-1 (ercu) qty. 01 no. (4) earthing cable for axle 3 to bog-2 (ercu) qty. 01 no.

Central Government / Public Sector

CTN :43593153 Due date: 12 Feb, 202612 Feb, 2026 NA
Tender For supply of primary spring inner for middle axle as per clw specification no . clw/ms/3/spec/eldo-bogie/004 . alt-2 or latest and confirming to clw drawing no.1209.01.115.009 alt-2 or latest. [ warranty period: 30 months after the date of delivery ]

Central Government / Public Sector

CTN :43593204 Due date: 27 Jan, 202627 Jan, 2026 NA
Tender For supply of axle box spring (for bogie brake van type bvzi) confirming to specification no.is:3195/1992(rev. 3) with amendment no. 2of sep. 2000, gr. 52cr4mo2v & rdso specn. no.- wd-01- hls-94(rev.5) (spring code-t01) and to rdso drawing no. wd-04050-s-02, item-4, alt. 4.(note:the spring must be of the c-type with a height falling within the range of 285.5mm - 290.5mm, as specified in rdso letter no. mw/bvzi dated 07-03-2013). [ warranty period: 30 months after the date of delivery ]

CTN :43591187 Due date: 02 Feb, 202602 Feb, 2026 NA
Tender For supply of poh kit complete for lateral dampers of m/s gabriel india ltd./pune make (capacity 200kg) for secondary suspension of emu/memu coaches with air spring arrangement bogie (2o ton axle bogie) consisting of 13 items as per enclosed annexure with icf's drg. no.-dc/ emu/m/asr/0-5-005.alt.p/6 (small p by six) ( alpha alt.-p, num. alt6): item no.-2 of icf for complete 200 kg. lateral damper and m/s gabriel drawing code no.- cg-29027 and m/s gabriel kit part no. - 129027-2. rdso specification no. c-8703(rev-3) of april.2023 and icf's drg.no.-dc/ emu/m/asr/0-5-005, alt.p/6 (small p by six) (alpha alt.-p, num. alt-6); item no.-2 [ warranty period: 60 months after the date of delivery ]

Central Government/Public Sector

CTN :43591207 Due date: 29 Jan, 202629 Jan, 2026 NA
Tender For supply of set of mn. wear plate liner for wam-4/wag-5 loco. sk. no. elw/bsl/sk. no. 7018, alt-9. one set consisting of 09 items, 190 nos. 1) wear plate for bogie frame assly. drg. no. elw/bsl/wam-4/4/f64.017, alt-1 -24 nos. 2) horn face liner. drg. no. skvl- 058 - 96 nos. 3) wear plate for cbc. drg. no. elw/bsl/wam-4/4/82.021, alt-1- 02 nos. 4) pivot liner. drg. no. elw/bsl/wam-4/4/ f64.009 r1 -02 nos. 5) wear plate for guide bracket. drg. no. clw 01/4/19/09 alt-3, ref-1 - 16 nos. 6) wear plate for hanger cover (centre). drg. no. clw 01/4/19/09 alt-3, ref-2- 16 nos. 7) wear plate for hanger cover (out side). drg. no. clw 01/4/19/09 alt-3, ref-3 - 08 nos. 8) bearing strip(equaliser seat) for axle box housing. drg. no. elw/bsl/f 61.022 - 24 nos. 9) pivot side liner. drg. no. elw/bsl/f 64.007, alt-1 - 02 nos.'' [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :43591191 Due date: 28 Jan, 202628 Jan, 2026 NA
Tender For axle damper for wap-7 locos as per clw's drg. no. 1209-01-215-014 (ref-1) alt.'2 or latest & specn. no. clw/ms/3/spec/eldo-bogie/002 (rev.nil) or latest. imported dampers should be used as per rdso's letter no. el./3.1.35/2 (3-phase), dtd. 31.03.2011. indigenous source of dampers who have (i) successfully completed 01 year of field trials on 10 loco sets for wap-7 class of locomotives and (ii) found suitable in performance test (after completion of field trial of one year on one loco set damper as per governing specification) may be considered for regular supply. (ref railway board letter no 2007/elect (trs)/440/6 (3 phase) dated 01.11.2023 & rdso letter no el/3.2.119 (dampers) dated 08.11.2023). [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :43591603 Due date: 27 Jan, 202627 Jan, 2026 NA
Tender For supply of standardized brake disc for axle mounted disc brake system for lhb fiat bogie to rdso drawing no.cg-15066, alt.1 and conforming to rdso specification no. rdso/2017/cg-02 (rev. 3 of april-2025) [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :43531932 Due date: 03 Feb, 202603 Feb, 2026 NA
Tender For supply of primary spring outer for middle axle for wag9 / wap7 locos as per clw/ms/3/spec/eldo-bogie/004 alt. 3 & clw drg. no.1209-01.115-009 alt-2 or latest. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :43504389 Due date: 20 Jan, 202620 Jan, 2026 NA
Tender For supply. lnstallation & commissioning of "unattended axle box acceleration measurement system {uabams)" as per technical specification no. tm/im/434 rev.4 in passenger trains at icf chennai along with consumables, technical support and spare parts during warranty period of two years.note: here uabams system means including accelerometers at axle and bogie level,data logger, junction box, tachometer, gsm & gps antenna etc. and all connectors and fixture. ]

Central Government / Public Sector

CTN :43477187 Due date: 02 Feb, 202602 Feb, 2026 NA
Tender For supply of standardized brake disc for axle mounted disc brake system for lhb fiat bogie etc.
 Loading, Please wait...

Connect us via What's Up