Web Analytics Made Easy - StatCounter

Track Material Tenders

Get complete information related to latest Track Material Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Track Material Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Track Material Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44535956 Due date: 21 May, 202621 May, 2026 NA
Tender For corrigendum : supply of brake rigging bushes for wap7/wag-9 as per drg no skvl-586 with latestalt. one set consists of 17 items as per rdso drg.no.skvl-586 with latest alt. [ warranty period: 30 months after the date of delivery ]

State Government

CTN :44806330 Due date: 28 Apr, 202628 Apr, 2026 3.00 Lacs
Tender For corrigendum : up-keeping and cleaning of drains, maintenance of lawns, cutting of bushes around the power house complex, different construction activities and other miscellaneous jobs of power house of uhl stage-iii 100mw at chulla distt. mandi hp

Central Government/Public Sector

CTN :44981669 Due date: 04 May, 202604 May, 2026 10.45 Lacs
Tender For providing of custom bid for services - cleaning of switchyard jungles, bushes and grass cutting at powergrid, rourkela sub-station

State Government

CTN :44975559 Due date: 29 Apr, 202629 Apr, 2026 7.66 Lacs
Tender For tggenco ktpp civil phd stage i dozing the soil, clearing the jungle including uprooting unwanted wild vegetation, grass, bushes, shrubs in unwanted areas using blade tractor and excavator in the plant premises area from 01.04.2026 to 31.03.2027.

CTN :44825387 Due date: 27 Apr, 202627 Apr, 2026 10.87 Lacs
Tender For corrigendum : annual maintenance contract for replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, take up pulley bearings replacement and overhauling of main reducer gearbox, r.c feeders and patch welding of 22" coal pipes from all corners of boiler to classifier outlet gate and dismantling of damaged feeder outlet upper and lower chutes and replacement of new/reconditioned chutes, replacement of center feed pipe of 36" gravimet feeder out let, repairing of 22" coal pipes from classifier outlet gates to all corners of boiler and rectification of coal leaks in critical areas of in service 22" coal pipes (48 no's) from mill outlet bends to fuel inlet bends,clearing of coal jam at bunker chute or bunker raw coal gate of unit-3 and 4, stage-ii, dr m.v.r. rtpp as and when required from the date of awarding work to 30.09.2026

CTN :44757118 Due date: 27 Apr, 202627 Apr, 2026 9.00 Lacs
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f

CTN :44977358 Due date: 08 May, 202608 May, 2026 NA
Tender For e-tender notice for annual maintenance contract for work of arresting grass & weeds growth, small thorny bushes, cutting & shaping of trees (excluding switchyard area) and controlled plantation in order to avoid the fire incidents / mishaps as per police/ats requirement point no. 15 at 400kv rs o&m division babhaleshwar.

CTN :44954944 Due date: 02 May, 202602 May, 2026 3.79 Lacs
Tender For repairing of winding engine drum brake and other allied fittings at pit no. b and fabrication and fitting of 4 set of gm bushes for cross head piston cylinder at pit no. a for safe and smooth winding operations under pandaveswar colliery, pandaveswar

CTN :44927693 Due date: 25 Apr, 202625 Apr, 2026 10.72 Lacs
Tender For corrigendum : replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, take up pulley bearings,opening and closing of r.c.feeder doors, replacement and overhauling of main reducer gearbox,repairing of 22 inch coal pipes from classifier outlet gates to all corners of boiler and rectification of coal leaks in critical areas of in service 22 inch coal pipes (36 no's) from mill outlet bends to fuel inlet bends,clearing of coal jam at bunker chute or bunker raw coal gate, clearing pulverised coal powder jam in coal pipes connecting from mill classifier outlet elbow to boiler coal nozzle of unit-1 and 2 for six months (ie from 01.04.2026 to 30.09.2026) in the year 2026-27

CTN :44957844 Due date: 01 May, 202601 May, 2026 30.58 Lacs
Tender For providing of custom bid for services - cutting & lifting of grass, wild bushes,thorny plants, tree trimming and uprooting in zone-i(u-05,u-10& four storage, u-11, u-15 as per scope of work attached
 Loading, Please wait...

Connect us via What's Up