Get complete information related to latest Traction Bar Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Traction Bar Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Traction Bar Tenders.
Tender For supply of tractionbar/metal rubber bush for vb ts coaches to gmt drg.no. 65081502, rev-05 items are to be manufactured as per ms. ec engineering rubber-metal elements specification no mt18br2 001468-03. [ warranty period: 30 months after the date of delivery ]
Tender For supply of housing for tractionbar as per clw drg. no.- 1209-01.113-002 (ait.-8) and rdso's smi no.-rdso/2006/el/sml/0241 (rev.-0) dt.-24.10.2006. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of 300 nb tail pipe ( reducer type) of collector tank, reducer from 300 nb to 150 nb, length: - 4630 mm , only conical set portion of collector tank with 5 mm ss liner for fae tower to be supplied. , water trap silencer for vaccum pump, pipe od- 450 mm, thick -8. 5 to 9. 2 mm length 1500 mm approx. , complete set of flushing apparatus below economiser hopper.
Tender For supply of set of retaining rings (pivot ring and housing ring) for housing of tractionbar, set consisting of following items:- (1) pivot ring as per clw drg.no.1209.01.313-005 alt-2 with latest alteration (ref.abb drg.no.ia016-00261 rev-3 with latest rev., qty/set-04 nos. and (2) housing ring as per clw drg.no.1209.01.313-004 alt-2 with latest alteration (ref.abb drg.no.ia016-0262 rev-3 with latestrev.), qty/set-04 nos.. spec./drg.no. clw drg.no.1209.01.313-004 alt-2 with latest alteration and clw drg.no.1209.01.313-005 alt-2 with latest alteration [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of tractionbar safety sling of wag-9 locomotives. as per els/hwh drg. no-trs/hwh/el605/13, alt-1. [ one set consist of 01 no long safety sling, 01 no short safety sling, 04nos pin, 04 nos. chain and 04 nos. r-clip ]
Tender For supply of tractionbar/metal rubber bush for vb ts coaches to gmt drawing no. 65081502, rev-05 items are to be manufactured as per m/s ec engineering rubber-metal elements specification no. mt18br2 001468-03. [ warranty period: 30 months after the date of delivery ]
Tender For supply of mill neutral thickener tailings and disposal area d d - selective replacement of worn out steel structures fabrication , selective replacement of worn out steel structures erection , selective replacement of worn out steel structures dismantling , selective replacement of worn out chequerred plates or ms gratings fabrication , selective replacement of worn out chequerred plates or ms gratings erection , selective replacement of worn out chequerred plates or ms gratings dismantling , replacement including dismantling erection and alignment of coneyor pulleys ,fittings of idlers and rollers , replacement and erection of feed bend conical seal and flat seal wiper of , repair or replacement of conveyor belt , dismantling of gear box trommel screens torsion shaft feed anddischarge sleeve launder hydrocyclone underflow and overflow valves coupling mill liners and girth , erection of gear box trommel screens torsion shaft feed anddischarge sleeve launder hydrocyclone underflow and overflow valves coupling mill liners and girth , replacement of propeller shaft , replacement of propeller blades , replacement of agitator assemblynt , fabrication of pipe size 15 nb to 40 nb , erection of pipe size 15 nb to 40 nb , dismantling of pipe size 15 nb to 40 nb , fabrication of pipe size 50 nb to 80 nb , erection of pipe size 50 nb to 80 nb , dismantling of pipe size 50 nb to 80 nb , fabrication of pipe size 100 nb to 150 nb , erection of pipe size 100 nb to 150 nb , dismantling of pipe size 100 nb to 150 nb , fabrication of pipe size above 150 nb , erection of pipe size above 150 nb , dismantling of pipe size above 150 nb , erection of jammed pipe size above 150 nb , dismantling of jammed pipe size above 150 nb , mill feed end trunion bearing or insert changing , mill discharge end trunion bearing or insert changing , erection of liner fitting in different chutes , dismantling of liner fitting in different chutes , lubrication of equipments , overhauling or replacement of slurry pumps