Tender For supply of tractionmotorblower including motor (wound with corona resistance wire) to specn.no. (1) clw/es/3/0019/g, (2) spec/e-10/3/09 (motor) with amendment nos.01, 02, 03, 04 & 05. with insulated b earing de/nde as per rdso letter no - el/3.3.176/1 dtd 19-08-2024 [ warranty period: 30 months after t he date of delivery ]
Tender For supply of de side end shield for m/s cgl make tractionmotorblower (tmb) motor for wag-9/wap-7 locos as per drg. no. elw/bsl/2/wag-9/35.010. [ warranty period: 30 months aft er the date of delivery ]
Tender For supply of tractionmotorblower including motor (wound with corona resistance wire). make for blo wer and motor : 1. blower : accel make. 2. motor : cgl make. [ warranty period: 30 months aft er the date of delivery ]
Tender For supply of circuit breaker for tractionmotorblower and oil cooling unit (pos no.53.1.59.1) type 17 as per clw specn no. clw/es/3/0096, alt-f or latest and abb no document no. hbtb 585554 r 3083 or latest. [ warranty period: 30 months after the date of delivery ]
Tender For 1) operation & maintenance work contract for hydraulically operated pedestal mounted stone grapple machine on as and when required basis installed in c.h.p.-ii (1x500 mw), t.p.s., khaperkheda, 2) work of complete repairing, reconditioning and refurbishment along with all required spares & accessories for the travel system of shuttle conv. 1 to 4 installed at chp-i, tps khaperkheda, 3) work of providing, fixing and testing of coal flow establishment system for conveyor chutes of apron feeder no. 1 to conv. 2c, apron feeder no. 2 to conv. 2d and conv. 3a to conv. 4a installed at chp-i (4 x 210 mw), tps khaperkheda, 4) work of annual overhaul maintenance of air preheater for unit no. 4, 5) work of repairing flue gas duct from eco outlet to esp inlet during unit no.4 coh., 6) work contract for conveyor belt jointing by cold / hot vulcanizing process at c.h.p.-ii,t.p.s. khaperkheda, 7) servicing of various doors, manholes of boiler during unit no. 4 aoh, 8) biennial work contract for housekeeping/cleaning to be carried out in service building acw/ccw p/h, time office etc at unit-5, 500mw, khaperkheda tps., 9) supply & application of chemical bonded plastic refractory for boiler during unit no. 4 aoh., 10) procurement of 22" victaulic coupling and sampling plug assy for coal pipes for unit 3 & 4, 11) work of radiography and interpretation of hp weld joints in boiler unit 4 during coh, 12) work of repair of boiler first & second pass buck stay in unit no. 4 coh., 13) supply of pa fan shaft for ndv 18 tiefstack in unit no. 1 & 2., 14) procurement of dresser coupling & coupling collars for coal pipe in unit no. 1 aoh, 15) procurement of guillotine gates chain links for u#4 coh for ahp-i, 16) supply & application of chemical bonded and firecrete refractory in boiler second pass and flue gas duct during unit no. 4 coh., 17) procurement of glands packing & spiral gaskets for coh u#1&4., 18) supply & application of fire crete refractory and allied works of bah for unit no. 4 coh, 19) procurement of fabricated burner tilt pins, levers & spares for 210 mw unit aoh, 20) procurement of spares for bfp recirculation valves.(u # 4 coh)., 21) servicing of gates & dampers of air & flue gas path in unit no. 4 aoh., 22) procurement of rcw headers and scalloped bars for unit 1 aoh of bah., 23) replacement of damaged g.i. roof sheets above at wagon tippler, bobr hopper area and various conveyor belts galleries at chp-i, khaperkheda tps., 24) procurement of various low pressure and low temperature steel consumable for u#1 coh., 25) supply of liner assembly (in 2 halves) for upper housing of coal mill xrp-803 hp at unit no. 1 & 2., 26) work of fabrication and replacement of reheater coil stub bend assemblies during unit no. 4 coh, 27) overhauling/servicing of low pressure valve during unit no. 1 & 4 capital overhaul, 28) procurement of various gromet slings for capital overhauling of unit 1 and 4, 29) removal and shifting of ndct drift eliminator during coh at unit no. 05, 1x500 mw, tps, khaperkheda., 30) work of providing and fixing of conveyor spillage control equipment at chp-i, tps, khaperkheda.
Tender For supply of dynamically balanced pully tractionmotorblower front or t.m.blower sheave & hub (front) to dlw drg no. tpl-1014 alt 'a' & dlw part no.11051516 drg no.tpl 1014 alt a [ warranty period: 3 0 months after the date of delivery ]
Tender For supply of tractionmotorblower with motor as per clw's spec. no.-clw/es/3/0019/g for w ag9 type electric locos [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of tractionmotorblower including motor (wound with corona resistance w ire) to spec. no. clw/es/3/0019 alt.- g, clw/es/3/0454 alt.- b (for motor), clw/es/3/0455 alt.- b (for blower), and rdso spec/e-10/3/09 (motor) with amendment nos. 01 to 06, rdso smi no. rdso/elrs/smi/185-2000 rev.-1 with amend. no. 1&2, str no. rdso/2008/el/str/0048 rev.- 0 & str no. clw/2021/eldo/e/str/0112 rev.-0. note: all hardwares are to be used should b e any of the following makes: a) un-brako (precision fastners), b) laxmi precision (lps), c ) sundaram fastners (tvs), d) all spring washers of forbes gokak ltd., mumbai make onl y. [ warranty period: 30 months after the date of delivery ]