Web Analytics Made Easy - StatCounter

Transmission Gear Tenders

Get complete information related to latest Transmission Gear Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Transmission Gear Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Transmission Gear Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43042364 Due date: 31 Dec, 202531 Dec, 2025 33.94 Lacs
Tender For corrigendum : supply of procurement of spares for shanti make gear box of model sbh320 sbh250 and hb092 d d ? g? g -input kit assy with gear, pinion and bearings, part no. - hb09212100121 , output kit assy with gear pinion and bearings, part no. - hb09212100122 , input pinion shaft, part no. - sbh250f1212200121 , matching gear of input pinion shaft, part no. sbh250f1212200122 , input shaft with matching gear for gear, part no. - sbh320f02

CTN :43332021 Due date: 05 Jan, 202605 Jan, 2026 75.0 Thousand
Tender For supply of assy propeller shaft rear,ht lead,idle air motor speed actuatc,chain and sprocket kit,spring assy front,oil seal,brg needle,bush king pin,gear box mtg pad,indtermediate shaft lower,pad set disc brake,motor assy starting,starter motor 24 voltos,siron,switch assy stop lamp,fog lamp assy,bracket clutch lever,air intake hose,combination switch,coolent pipe

CTN :43321926 Due date: 03 Jan, 202603 Jan, 2026 NA
Tender For supply of assy universal joint , pressure pipe , brake light switch , relay , fuse , cable assy speedometer , fuel filter , cover assy , spider bearing , gross holder , diode 40 , gear transfer case , gear shaft transfer case , roller bearing transfer case , fly wheel brg , frt wheel bearing , gear box oil seal , commander light

CTN :43322296 Due date: 03 Jan, 202603 Jan, 2026 NA
Tender For supply of complete vehicle servicing washing and changing of engine oil diesel filter oil filter air filter and fitting , wheel alignment balancing and tyre rotation , replace of clutch plate pressure plate with clutch bearing , engine tunning and tappit settings , greasing of vehicle with unsv bearings sets , repair of gear lever assembly by replacing rubber joints , repair replacement of rear brake cylinder assembly , rapair of noisy differetail box assembly , repair replace of shaft penion joint assembly with bearing set 02 nos , new fittings of unsv tarpoline defence , replacement of wipper motor assembly , replacement of unsv brake linear front and rear , welding work on tail board joints , repair replace of air pressure maintain valve , minor denting painting work right mudguard , replacement of rear brake light assembly right

CTN :43322339 Due date: 03 Jan, 202603 Jan, 2026 NA
Tender For supply of hand rest , side indicator , steering oil seal kit , clutch master cylinder assy , wheel cyl assy , wiper blade 24 inch , wiper blade 20 inch , clutch master cyl assy , gear box mtg pad , oil seal crank shaft , assy oil filter

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

CTN :43322052 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For supply of air filter , fuel filter , sensor water temp , water pump assy , tie rod end , propeller shaft flange , bolt upper 50mm , assy propeller shaft gb to , steering hose pipe , steering pipe gear box

CTN :43322080 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For supply of radiator pipe , oil seal , uj kit propeller shaft , needle brg nk 55 35 , stg gear box oil seal , cabin shock absorber , water pump assy , tail lamp assy , shroud assy , revoling light assy beacon light , accelerator rod set

CTN :43321903 Due date: 07 Jan, 202607 Jan, 2026 NA
Tender For supply of hub seal rear 110 140 13 , radiator hose pipe , release brg , door glass regulator , door lock lh , door lock rh , propeller shaft bolt , 4 by 4 cable , pressure plate , 17 by 19 fuel pipe , accelerator cable , trailer control valve , air pressure pipe booster , water pump , flange lock propeller shaft , gear box oil seal 9878 , door beeding rubber
 Loading, Please wait...

Connect us via What's Up