Tender For construction of tr bay foundations, cable trench, fire protection works, rcc road, metal spreading, repair and maintenance of compound wall-control room, bore and water supply work and miscellaneous civil works at 220kv shapur sub-station under am circle junagadh under ksy- ii
Tender For repair/replacement of lt ug cable, lt poles, control panels board, change over switches and allied items at af station naliya under ge(af) naliya - taking out old unserviceable lt cable of any size any type from trench/duct/ poles / roof/pipe etc and keeping aside for segregation of serviceability. serviceable cable will be re-laid at same place or other place as required complete all as specified and directed., supply, laying and connecting xlpe insulated, armoured, heavy duty electric cable multi stranded aluminum conductors, 1100v grade, of size 06 sqmm 2core with proper size of lugs and laid in trenches / ducts / through gi pipe / fixed to poles etc complete all as specified and directed. note: excavation earthwork, cable covers, sand cushioning and gi protection pipe shall be measured and paid separately under relevant item., all as per serial item number 2.00 here-in-before but of size 16 sqmm 4 core., all as per serial item number 2.00 here-in-before but of size 35 sqmm 3.5 core, all as per serial item number 2.00 here-in-before but of size 50 sqmm 3.5 core, all as per serial item number 2.00 here-in-before but of size 70 sqmm 3.5 core, all as per serial item number 2.00 here-in-before but of size 95 sqmm 3.5 core, re-laying of old serviceable cable of any size obtained from item above. note:- excavation earthwork, cable covers, sand cushioning and gi protection pipe shall be measured and paid separately under relevant item., excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth and getting out in soft/ loose soil, for laying of under ground electric cable, pipes etc complete all as specified and directed. note:-(i) authorised width & depth shall only be excavated, measured and paid as specified in clause 3.2.3 of ssr part ii and 19.74.1 of ssr part i for cable/pipe laying portion.(ii) serviceable pcc /rcc cable cover obtained during excavation shall be stacked separately carefully without any extra cost to the deptt., material and labour for river bed sand filling in trenches/ ducts 15 cm above cable and 8 cm under the cable for cushioning/protection to cable including spreading, leveling and get thick 18cm after hand punning complete all as specified and directed, laying only serviceable un-reinforced precast concrete cable cover class lv, type 1, flat, of 250 mm x 150 mm x 40 mm obtained from trenches, abetting each other with gap between adjacent slab not exceeding 10 mm over under cable for protection complete all as specified and as directed., supply and laying un-reinforced precast concrete cable cover, class lv, type 1, flat, size 250 mm x 150 mm x 40 mm abetting each other with gap between adjacent slab not exceeding 10mm over under cable for protection complete all as specified and as directed., returning, filling in, including spreading, leveling, watering and well ramming in layer not exceeding 25cm thick each complete all as specified and directed., removing excavated soil to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.50 metre above the starting point complete all as specified and directed., material and labour for cutting under the road /pavement /hard standing or in any other situation with the manual labour for crossing of u/g cable through it and making both the end good complete all as specified and directed ., supply and laying gi water tubing of 80 mm bore, light grade, is-1239 marked with all fittings is marked and laid in trenches/under roads/in drains with suitable size flat iron/gi clamps, bolts, nuts and washers etc for cable protection complete all as specified and directed., supply and laying gi water tubing of 50 mm bore, light grade, is-1239 marked with all fittings is marked and laid in trenches under roads/in drains, fixed to poles/walls with suitable size flat iron/gi clamps, bolts, nuts and washers etc for cable protection, complete all as specified and directed ., supply and laying gi water tubing of