Get complete information related to latest Truck Tank Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Truck Tank Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Truck Tank Tenders.
Tender For name of work annual repair and maintenance of building in bm iii division during 2024 25 sh hiring of tipper truck for day to day maintenance works at service centre under bm iii division
Tender For supplying drinking water with own vehicle like trucktanker or tractor tanker in the area of municipal council kamptee dist-nagpur for the year 2025-26
Tender For custom bid for services - carrying out t4s audit for bpcl lpg bottling plant jhansi - up-consultancy services is for audit as per pngrb t4s and other codes of practice for the bpcl lpg bottling plant jhansi up . the technical audit as per pngrb regulation & codes will include:- a) visit of audit team to be conducted. b) the scope of technical audit will be done as per the approved checklist of pngrb as per t4s standards and various codes of practice/ safety and includes checking of the documentation, visit of bpcl lpg bottling plant, design, fabrication, installation, layout, testing, tanktruck/ tank wagon loading/ unloading, lpg pump and compressor house, storage vessel area, lpg cylinder filling shed, filled shed, evacuation shed, electrical, cathodic protection, instrumentation, fire prevention/ protection system, safety management system, security system and procedure for installation, internal safety audits, ppe c) the overall objective of tpia audit is to examine the compliance with respect to t4s standards and other codes of practice as given in pngrb. d) the tpia shall be approved by pngrb and shall produce the relevant validity certificate of approval from pngrb. e) tpia auditor must be conversant with t4s specification and codes of practice. f) tpia checklist is in three parts, namely; critical activities conformity, general conformity with t4s and general observations g) tpia audit team will specify status/ answer to each serial no. of checklist given. h) in case, there is a non-conformity identified by tpia, entity should specify the mitigation measures including time limit, duly approved by pmc/tpia/technical head of the entity. i) tpia must enclose a separate sheet of non-conformity