Get complete information related to latest Upvc Pipeline Laying Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Upvc Pipeline Laying Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Upvc Pipeline Laying Tenders.
Tender For corrigendum : daily operation, routine maintenance and comprehensive annual maintenance of 300 tr hvac system consisting of 3 nos. air-cooled packaged screw chillers of 100 tr each, screw compressors, air-cooled condenser, chilled water pumps, ahus, chilled water piping with all the valves, ducting, electrical panels, vfd panel of secondary chiller pumps and other associated equipment of the central air conditioning plant of science exploration hall of science city, kolkata.
Tender For supply of high efficiency thermal conditioning system procurement package - compact high efficiency thermal unit , installation and commissioning service , refrigerant piping and insulation system , electrical power and control system , mounting and support accessories
Tender For corrigendum : supply of vms software application life time , software application server system , user application system and display unit , utp cat 6 outdoor armoured copper cable , ups 3750 plus 36 v 200ah including 03 batteries , online ups rt 2kv 1800w 0.9 pf 72v internal batteries 6x7 ah batteries , ups line entire software application system including cabling , hardware and networking cabling laying piping digging , customized outdoor 32 inch screen fabrication ip67 with pole smps power modular with cooling fan , rfid hf mi-fare smart card , rfid hf mi- fare card dual side printer including life time software , rfid hf token keyfob , other fabrication work , networking and configuration of entire system , optical fibre cable 6 core single mode including cabling laying piping and digging trenching and refilling the same after laying ug cables , 10 port data switch ten and hundred and thousand mbps with sfp modular manageable switch ) /bid number : gem/2026/b/7373023 * /dated: 18-03-2026 & & / bid document 1 / 18
Tender For construction of new admininstrative building (s plus 6) and senate building(g plus 1) including internal services fire fghting fire alarm system lifts ups cctv ip pbx street lighting overhead water tanks ug tank pumps vrf system hvac piping & ducting system passive lan system external development works(internal roads paths external services) and roof top solar photovoltaic power generating system diesel generator set substation equipments etc at iit roorkee uttarakhand.subwork/packages:construction of new administrative building (s plus 6) and senate building (g plus 1)
Tender For supply of energy efficient environmental conditioning system procurement package : : - high efficiency wall mounted thermal unit , installation and commissioning service , refrigerant piping and insulation system , electrical power and control system , mounting and support accessories
Tender For supply of advanced thermal regulation and environmental control system : : - high static pressure ceiling integrated module , distributed wall mounted exchange unit , installation and commissioning , piping and insulation system , electrical and control integration
Tender For corrigendum : with all contingent civil including staff quarter electrical mechanical piping and instrumentation works with three months trial run including three-year defect liability period shimla and operation and maintenance of entire system for 5 years - design, supply, construction, installation, testing and commissioning of sewage treatment plant of 1.40 mld at dhalli-ii ghati mohanpur shimla based on modern sbr technology including entire network with all contingent civil, (including staff quarter), electrical, mechanical, piping and instrumentation works with three months’ trial run including three-year defect liability period and operation & maintenance of entire system for 5 years.(estimate cost: rs.24,98,39,895/- emd rs.25,73,400/-
Tender For supply of supply of 20tr ductable package units , itc of 20tr package unit , pressure testing and vaccumming and nitrogen flushout , refrigerant charging entire system , ms structure modification for odu mounting arrangement , dismantling of existing machine , refrigerant piping and modification , communication cable between idu and odu , canvas connection with zip on machine outlet , gi 22gauge duct mouth connection modification , acousting insulation 15 mm thick for the mouth connection modification piece , lifting shifting and positioning of the machines , comprehensive maintenance after completion of warranty 1st year , comprehensive maintenance after completion of warranty 2nd year , comprehensive maintenance after completion of warranty 3rd year , comprehensive maintenance after completion of warranty 4th year , comprehensive maintenance after completion of warranty 5th year