Tender For supply of lmp make drilling rig water body, engine mounting, fi pump, machine gear etc. spare parts - water body assy new modle , water body packing set , front engine mounting , rear engine mounting , metacone engine mounting bolt with nut 4%" , metacone engine mounting bolt small , engie foundation bolt with nut , nozzle pipe washer , washer plain and spring mixes size , tappit cover packing , fi pump bolt with nut and sleeve , water booy base plate , fipump patti set upper and lower engine , water body rail plate bolt , water body hose connecion , water body hose connecion clip , hose pipe l type , hose pipe clip , radiator foundation set , hose pipe hockey type , side glass big , screw driver big , plier h. duty , sprit leaver , measuring tape 30 mtr , jarican 50 ltr , suction hose pipe 3" , spade with handle , hose clip 3" , foot ball 3" , foot ball nipple 3" , grease gun h.duty , wheel spanner leyland , wheel spanner tata , jack rod heavy duty , air cleaner clip 5" , air cleaner hose 5" x 2%" , nozzle rubber , nozzle washer , benjo washer , benjo bolt , leak off pipe , gear box packing set , gear box oil seal , gear box cottor , anabond tube , top gear , top gear bearing , top gear roller bearing , gear box retainer , top gear sleeve , top gear chucknut , top gear makkhi washer , diesel return pipe , gear box shim , top bearing lock , gear bearing long roller type , bearing shim , gear box fork , kelly hose pipe for machine 7 mtr long , radiator coolint pipe , radiator coolint pipe clip , damn belt , bolt with nut , benjo bolt , chamber bolt , water body stud with nut , bolt with nut 2"
Tender For bid to ras repair of veh - rear axle removing the vehicle and taken to lathe machine shop and checking the teeths , brake shoe lining with rivet , brake booster repair and service overhauling , brake booster assembly new , crown pinion assembly removing stripping checking and old worning oil , gear box assembly auxiliary gear box removing the vehicle and taken to the lathe machine shop , self starter assembly stripping and checking all parts armature buring field coil burning solenoid , the above all assembly removing the vehicle and repair service parts and brake shoe , oil filter , liner sleeve , head gasket hino engine , connecting rod bearing , valve inlet and exhaust , valve guide , valve seal , piston rings , gasket kit , turbo charger repair and service with damaged rings and packing change and turbo assembled and tested , head assembly taken to the lathe machine shop and checking the head and stripping , rotary pump removing the vehicle taken to the pump house and stripping all parts , the above mentioned all parts removing the engine engine parts fully cleaning and checking piston
Tender For corrigendum : supply of repl of main rails and raising of rails , tightening, repl. of all bolts, clits. , repl,re fixing of bushes , repl of spur gear assembly , repl of rack pinion , oh of reduction gear box , replacement of sector gear , alignment, grouting of tippling base rollers , repl,repairing of hopper grill , alignment of tipplers , repl,repairing of outboard stool , dismantling,repl of top pivot housing , repl of wooden block , matching of teeth of sector gear , re-fixing lock lever , repl of top stop locking gears assly , side beam fixing of tippler , alignment of motors of wagon tippler , servicing of spray line valve size 4 inch , servicing of spray line valve size 3 inch , servicing of spray line valve size 2 inch , oh of overhead spray pumps , servicing of spray nozzles , lifting, proper fixing of vf tray , changing, fixing of side packing , to provide the patches , repl of plates of vf tray, chutes , removal of foreign , fillings oil in gear box , servocoating,tightening, repl of damaged bolts , greasing of all the nipple point , repl of break shoe liner , repl of main rail beam of wagon tippler , provision of backup in main rail beam , work on central platform , repairing of main rail beam , repairing of rollers of coal spill plates , fab, erection of back support of vf mouth chute , fab. , installing of vf tray supports , repl of coal spill plate , repairing of pit platform of main rail beam , repl of damaged beam of vf , repairing of counter balance beam , repairing of mdu base structure , repairing of damaged split spur gear , fab. , of mouth piece of vf , erection of new fabricated mouth piece of vf , oh of hoisting system , oh of hopper spray pump, line , provision of hopper liners, in coal hopper of vf , fab. erection of coal hopper partition stool , raising and re-fixing of mouth piece of coal liner chute of vf , repl of back,side plate of mouth piece , to attend the coal leakage from top mouth piece , re-fixing,repositioning of side and back supports , repairing,reposition of side guards of mouth piece , repl of buffer block and buffer pads of counter balance beam , repl of brake drum of thruster brake assly , repl of input,output,intermediate pinion of gear box , fab. and erection of counter balance beam , repairing of wagon tippler plate form by cutting and welding , removing the fallen loaded wagon in pit , inserting the side beam pins in bracket , dismantling,removing the broken shafts of wagon tippler , installation of drive and adjacent intermediate shaft , cutting, fabricated and installation of resting outer rail beam bottom plate
Tender For supply of than 2m , fab inst of back plate , align of motor to gb , removal of top cover of helical gb , maint work of gb , replacement of ip shaft brg of gb , replacement of the output wheel of gb , repairing of hold back , replacement of gb , oh of gb of conv. 4,10,11,12,15,16,k10 , oh of gb of conv 8 , 9 , oh of gb of tripper , re railment of 2 w align of tripper , rerailment of 4 w , align of tripper , repairing work of square bar of tripper , repairing of broken chain of tripper , replacement of chain sprocker of tripper , replacement of chain of tripper , replacement of gb of tripper , replacement of axle of tripper , fab. of vertical support of tripper , fab of middle support of tripper , leaving of squre bar channel bolting , oil filling insp of gb of conv syt , repairing oh of sump pump k10 ,17 , repairing of gravity take up box , assly of spare pulley with bearing , replacement of damaged slewing pinion , repl of shaft oil seal of slewing gb , trough roller repairing overhauling , return roller repairing overhauling , impact roller repairing overhauling , dismant replace of coupling of pusher , repl repair of support pipe of oh cond , replacement of stay wire turn buckle , alignment of conductor pole , alignment with motor and commissioning , replacement of damage wheels shaft gear , dismantling replacement break system , counter weight placing in position , dismant replace of coupling of wt , repair of damaged top beam of wt , replacement of damaged top beam of wt , repairing of connecting arms of wt , re setting of displaced rest wall , replacement repair of side jack , re setting of steel plate f top beam , servicing of side centre wheels of wt , replacement of platform rails with clits , replacement of cage ribs stiffeners , repair of round of side box beam , replacement of platform angle , repair of shock absorbers , replacement of platform plate , repairing of mesh jolly of wt , replacement parts alignment of motor , repair replacement of break system , repair replacement of guide rollers , replacement of packing on top beam , replacement of side jacks , rest walls , oh replacement rest rollers and cradle , replacement repair of platform rails , overhauling and alignment motor of bf , replacement of structure of bf , replacement of adjt bolt of belt feeder , overhauling of sf replace damage part , repairing of mesh jolly of swing feeders , oh replace parts of drum of conv 1 , oh replace parts of drum conveyor 2 , oh replace parts of drumcon 3 k13 , oh replace parts of drum conveyor 6 , oh replace parts of drum conveyor 7 , oh replace parts of drum conveyor 8 , oh replace parts of drum conveyor 9 , repair servicing of trolly of conv 1 , repair servicing of trolly of conv 2 , repair servicing of trolly conv 3k13 , repair servicing of trolly of conv 6 , repair servicing of trolly of conv 7 , repair servicing of trolly of conv 8 , repair servicing of trolly of conv 9 , replacement belt tensioning sys conv 1 , replacement belt tensioning sys conv 2 , replacement belt tensioning conv 3 ,13 , replacement belt tensioning sys conv 6 , replacement belt tensioning sys conv 7 , replacement belt tensioning sys conv 8 , replacement belt tensioning sys conv 9 , making of fasteners joint conv and bf , shifting laying of conv belt f j , greasing of drums up to dia 630 mm , greasing of drums dia 630 1000 mm , greasing of drums dia 1000 1290mm , replacement of drum up to dia 630mm , replacement of drum dia 630mm 1000mm , replacement of drum up to 1000 1290mm , re fitting of shaft of drum dia 630mm , re fitting of shaft of drum 630 1000mm , re fitting of shaft of drum 1000 1290mm , re fitting at brg portions of drums //bid details2 / 95630mm , re fitting at brg drums , replacement damper gate reducer system , replacement damper gate system new , fabrication ,erection centering plate , fbr repairing chute inspection door , repairing of chute by patching of holes , oh of 20 mt capacity crane conveyor 2 , oh of 20 mt capacity crane w