Tender For tender for supply of supply and installation commissiong d d -supply installation testing and commissioning of 2tr 24000 btu per hour minimum bee 3 star rated confirming to is 1392 part 2 2018 inverter type cassette split ceiling mount air conditioner having wireless remote controller led display for indoor unit motorized vertical horizontal swing controls air filters uto restart with memory features inbuilt drain pump rotary scroll hermetically sealed compressor and initial charge of eco friendly refrigerant condensor and evaporator coils of copper material suitable for operation on 230v 10 single phase 50hz ac power supply the indoor unit shall be suspended from the ceiling using threaded rods including clamps bolts nuts etc and the outdoor unit shall be mounted on floor complete as required , supply and laying of soft drawn copper refrigerant pipe of suitable size for 2tr air conditioners for interconnection of suction and liquid lines between indoor and outdoor unit with tubular thermal foam insulation including necessary brazing jointing etc as required for cassette split air conditioner as required for item no 1 , supply laying of 4c x 25 sqmm frls pvc insulated 1 1 kv grade pvc sheathed multistrand flexible copper cable confirming to is 7098 pt 1 1988 along with the refrigerant lines for connecting indoor and outdoor units , supply and fixing of 25 mm dia minimum thickness of 1 2mm pvc drain pipe along with accessories and necessary clamps with an u trap at the end as required , supply and fixing of 75mm dia minimum 18mm thickness pvc covering pipe using necessary bend colloc clamps threded rod supports accessories etc for laying copper refrigernt line electrical cable and drain line as required. , supply and installation of floor mounted powder coated ms 25 x 25x5mm l angle frame including clamps bolts nuts vibrating dampers as required , drilling of hole using core cutting machine of size up to 100 mm dia in concrete stone wall ceiling for laying refrigerant lines etc and finishing the same with cement mortar after laying , dismantling shifting of old 2tr cassette split air conditioner having indoor and outdoor units associated refrigerant pipes electrical wires and drain pipes including pump down of refrigerant. , making of necessary alteration of existing gypsum false ceiling for installation of cassette air conditioner indoor units including necessary aluminium channel support gypsum board necessary accessories including painting to match for the existing false ceiling , supply installation testing and commissioning of 2tr 24000 btu per hour and iseer value five star rated and compliance with is 1391 part 2 2018 wall mounted inverter type hi wall split cooling inverter air conditioner having wireless remote controller with led display hermetically sealed scroll rotary compressor and eco friendly refrigerant initial charge of refrigerant condensor and evaporator coils of copper material air filter with auto swing auto restart features suitable for operation on 230v single phase 50hz ac power supply the indoor unit shall be fixed rigidly on wall using necessary frame the outdoor unit shall be mounted on floor laying and interconnection of standard length copper refrigerant piping as supplied by the oem between indoor and outdoor units complete in all respects as required necessary drilling of hole and finishing the same to match for the surrounding as required. , supply and laying of beyond the standard length supplied by the oem copper refrigerant pipe of size suitable for 2tr air conditioners for interconnection of suction and liquid lines between indoor and outdoor unit with tubular thermal foam insulation for hi wall split air conditioner as required for item no 1 , supply laying of 4c x 25 sqmm frls pvc insulated 1 1 kv grade pvc sheathed multistrand flexible copper cable confirming to is 7098 pt 1 1988 along with the refrigerant lines for connecting indoor and outdoor units , supply and fixing of 75mm dia minim
Tender For job work--greasing per wheel, greasing per wheel, brake lining including fitting, king pin work per king pin, diesel tank opening, fitting and repairing, engine oil with oil filter change, engine head opening and fitting tata, engine head opening and fitting leyland, engine head tappet fitting tata, engine head tappet fitting leyland, engine replacement euro-2/3 tata, engine replacement euro-2/3 leyland, engine replacement euro-4, piston ring job complete, radiator assembly replacement, viscous fan assembly replacement complete work, inter cooler assembly replacement, turbo charger replacement, side plate packing change complete work tata, ac unit replacement, ac unit repair, cooling plate packing change complete work, timing plate replacement complete work, timing cover oil seal replacement complete work, rear main engine oil seal replacement complete work, engine side wheel replacement complete work, cam mount replacement complete work, engine mounting pad replacement. front/rear engine assembling tata/leyland dismantling and assembling. removing fi pump, fastening fi pump, removing injector, fitting injector, complete injector repair, replacing lever and boot of euro-2/3 fi pump. complete works a fi pump assembling euro-2/3 complete works a clutch plate/driver plate change, gear box replacement lb.40 a gear box replacement lb.60 a clutch release bearing replacement, clutch release bearing repair. a clutch sleeve cylinder replacement, clutch sleeve cylinder repair, clutch master cylinder replacement, clutch master cylinder repair, dismantling and fitting clutch booster b.s.04 a p.o.t. opening and fastening to t.a.t., rubber coil changing tata, rubber coil changing leyland, rubber coil with centre bearing changing tata, rubber coil with centre bearing changing leyland, sliding yoke replacement, sliding yoke repair, p.o.t. cross repair to t.a. gear box front seal replacement. gear box assembling tata, gear box assembling leyland.a gear box oil change tata.a gear box oil change leyland.a gear lever setting tata.gear lever setting leyland.clutch plate repair tata.a clutch plate repair leyland.a proar plate repair tata.a proar plate repair leyland.a nt spring replacement per piece, nt spring repair per piece, nt chassis bracket replacement per piece, nt brake dam replacement, nt brake diameter assembly replacement, diameter warp replacement, nt axle complete disassembly, nt axle complete assembling.toy rod repair.pull & pull rod repair. nt stub axle disassembly, nt hub disassembly, rear spring replacement per piece, rear spring repair per piece chassis bracket per piece, brown cage assembly complete replacement, brown cage assembly complete repair, rear axle complete disassembly, rear axle complete assembly. rear diaphragm assembly replacement, rear brake drum replacement, hub disassembly, accelerator cable replacement, steering box assembly replacement, steering rod and steering wheel replacement, power steering vane pump replacement, power steering vane pumprepair. steering box overhaul, air drier fitting, air drier repair. dual valve repair, protector valve fitting, dd unit repair, dd unit replacement, pretank replacement, self starter replacement, self starter repair, alternator replacement, alternator repair, complete wiring repair, wiper main fitting, fog light fitting, wind star glass fitting per glass, seat fitting per seat, seat metal panel opening and fastening per running feet, body stiffener channel straightening per running feet, body stiffener angle straightening per running feet, battery box iron fitting, chassis straightening, panelling complete body, corner and back rexine replacement of one seat, mazda rubber replacement, chassis u bolt tightening and fitting, front glass rubber beading replacement, front bumper/rear bumper straightening, front stop replacement, front stop repair, front stop grill replacement, front stop grill repair, front window screen repair, front wind screen replacement, side window fr
Tender For job work--greasing per wheel, greasing per wheel, brake lining including fitting, king pin work per king pin, diesel tank opening, fitting and repairing, engine oil with oil filter change, engine head opening and fitting tata, engine head opening and fitting leyland, engine head tappet fitting tata, engine head tappet fitting leyland, engine replacement euro-2/3 tata, engine replacement euro-2/3 leyland, engine replacement euro-4, piston ring job complete, radiator assembly replacement, viscous fan assembly replacement complete work, inter cooler assembly replacement, turbo charger replacement, side plate packing change complete work tata, ac unit replacement, ac unit repair, cooling plate packing change complete work, timing plate replacement complete work, timing cover oil seal replacement complete work, rear main engine oil seal replacement complete work, engine side wheel replacement complete work, cam mount replacement complete work, engine mounting pad replacement. front/rear engine assembling tata/leyland dismantling and assembling. removing fi pump, fastening fi pump, removing injector, fitting injector, complete injector repair, replacing lever and boot of euro-2/3 fi pump. complete works a fi pump assembling euro-2/3 complete works a clutch plate/driver plate change, gear box replacement lb.40 a gear box replacement lb.60 a clutch release bearing replacement, clutch release bearing repair. a clutch sleeve cylinder replacement, clutch sleeve cylinder repair, clutch master cylinder replacement, clutch master cylinder repair, dismantling and fitting clutch booster b.s.04 a p.o.t. opening and fastening to t.a.t., rubber coil changing tata, rubber coil changing leyland, rubber coil with centre bearing changing tata, rubber coil with centre bearing changing leyland, sliding yoke replacement, sliding yoke repair, p.o.t. cross repair to t.a. gear box front seal replacement. gear box assembling tata, gear box assembling leyland.a gear box oil change tata.a gear box oil change leyland.a gear lever setting tata.gear lever setting leyland.clutch plate repair tata.a clutch plate repair leyland.a proar plate repair tata.a proar plate repair leyland.a nt spring replacement per piece, nt spring repair per piece, nt chassis bracket replacement per piece, nt brake dam replacement, nt brake diameter assembly replacement, diameter warp replacement, nt axle complete disassembly, nt axle complete assembling.toy rod repair.pull & pull rod repair. nt stub axle disassembly, nt hub disassembly, rear spring replacement per piece, rear spring repair per piece chassis bracket per piece, brown cage assembly complete replacement, brown cage assembly complete repair, rear axle complete disassembly, rear axle complete assembly. rear diaphragm assembly replacement, rear brake drum replacement, hub disassembly, accelerator cable replacement, steering box assembly replacement, steering rod and steering wheel replacement, power steering vane pump replacement, power steering vane pumprepair. steering box overhaul, air drier fitting, air drier repair. dual valve repair, protector valve fitting, dd unit repair, dd unit replacement, pretank replacement, self starter replacement, self starter repair, alternator replacement, alternator repair, complete wiring repair, wiper main fitting, fog light fitting, wind star glass fitting per glass, seat fitting per seat, seat metal panel opening and fastening per running feet, body stiffener channel straightening per running feet, body stiffener angle straightening per running feet, battery box iron fitting, chassis straightening, panelling complete body, corner and back rexine replacement of one seat, mazda rubber replacement, chassis u bolt tightening and fitting, front glass rubber beading replacement, front bumper/rear bumper straightening, front stop replacement, front stop repair, front stop grill replacement, front stop grill repair, front window screen repair, front wind screen replacement, side window fr