Tender For corrigendum : erection, testing, commissioning, trial operation & handing over including handling of materials at bhel / clients stores / storage yard and transportation to site, preparation of foundation, ndt, fixing of hangers & supports, application of lining, insulation, supply & painting, stenciling & labelling of steam turbine – generator – condenser with all auxiliaries, pumps (including cw, acw, raw water, misc.), dosing systems (lp, oxygen, naoh etc.), lube oil purification system, condenser on line tube cleaning system, plate heat exchangers, tg integral piping, dg sets and misc equipment etc., including tg-eots, fire detection & protection system of associated tg oil canal piping & mot room at unit-1 of 2x800 mw ntpc lara stpp stage-ii: package-a: unit # 1 - stg & auxiliaries along with all associated equipment, all misc. pumps (incl. cw, acw, raw water), piping, tg integral piping, dg sets, tg-eot, misc. equipment and fdps of tg oil canal & mot room of 2x800 mw ntpc lara stpp stage-ii
Tender For corrigendum : providing of custom bid for services - custom bid for services - valce salvaging job; f work covers salvaging of defective sc valves and restoring them for reuse as per standard procedures and instructions of the officer-in-charge. the contractor shall carry out the following activities in a safe, systematic, and accountable manner: 1. salvaging operations salvaging of defective sc valves shall be carried out as per laid-down procedures using the valve test bench and/or any other equipment or method advised by the officer-incharge. the contractor shall collect defective sc valves from the store after obtaining necessary approvals. 2. cleaning & preparation clean all defective sc valves in the ultrasonic valve cleaning machine and/or other approved valve cleaning systems. ensure all valves are thoroughly cleaned to remove dirt, oil, or contaminants before testing. segregate cleaned valves properly for further inspection and testing. 3. segregation & testing segregate valves based on their source (e.g. hot repair, defective, pin leak, scrapable cylinders, etc.). perform low pressure and high pressure testing of the valves as per laid-down procedures and test parameters. identify valves that are fit for reuse and those that are defective/rejects. 4. salvaging & assembly replace the old o -ring washer of all good salvaged valves with new o -ring washers (to be provided by hpcl). fit safety caps and back covers on the salvaged valves to protect them from dust and contamination. ensure salvaged valves are clean, properly assembled, and ready for storage. 5. storage & documentation arrange salvaged valves type-wise in a countable and organized manner and deposit them in the stores. ensure proper handling to avoid damage or mixing of valve categories. maintain shift-wise records of: o number of valves received, o number of valves cleaned, tested and salvaged, o number of valves rejected. 6. manpower & productivity contractor shall provide minimum one manpower per shift. a minimum target of 400 sc valves shall be salvaged per manpower per shift. inventory of defective valves pending salvaging shall not exceed one day s generation. 7. materials & consumables hpcl shall provide o -ring washers, safety caps, back covers, and other reusable fittings. kerosene and other cleaning consumables shall be supplied by the vendor. contractor shall ensure availability of all tools and accessories required for smooth execution. 8. certification & payment the shift officer shall certify the salvaged quantity at the end of each shift. payment shall be made strictly on actual quantity salvaged and accepted by hpcl. any deviation or failure to meet daily targets may attract penalty as per tender terms. 9. safety & compliance all activities shall be carried out in compliance with hpcl safety norms and oisd guidelines. personnel shall wear required ppe (gloves, goggles, shoes, helmet) during operations. all salvaging and testing activities shall be conducted under the supervision of hpcl personnel.
Tender For corrigendum : supply of pump operator trade c c - ladle 150mm dia. , left cut strips 250mm , level bottle spirit 150 ml. , lifting jack screw type 3 ton capacity , magneto spanner set with 8 spanners , magnifying glass 75mm , manila ropes 12,20,30 mm dia. , masonary bit assorted upto 12 mm , master test bars different size , megger 500 v , mobile crank , multimeter digitl , oil stone 15 cm x 5 cm x 2.5 cm , pipe cutting tool , pipe wrench 45 mm , plumb bob , pneumatic scaper with adjustable stroke , portable electric drill machine , portable jack , prick punch 15 cm , punch letter 4mm number , scientific calculator , screw jacks , shear tin mans 450mm x 600mm , solid parallels in pairs different sizes in metric , spanner oyburn 15 cm , spark plug spanner 14mm x 18mm size , square box wrenches , square t wrenches , srdg ball bearing, drg ball bearing, sel aligning ball bearing , steel measuring tape 10 meter in a case , stud extractor set of 3 , stud remover with socket handle , surface guage with dial test indicator plunger type i.e. 0.01 mm , tachometer counting type , telescope guage , temperature guage 0-100 deg c , thermostat , three cell torch , three phase 50 hz 5 mp ac squirrel gage induction motor with star delta starter , torque wrenches 5 to 35nm and 50 to 225 nm , trammel 30 cm , tube expander up to 62 mm , universal puller for removing pulleys, bearings , vibrometer , vice grip pliers , voltmeter ac to 500 v , wall hoists , hydraulic leak testing equipment , injector testing set hand tester , liquid penetrant inspection kit , multi stage pump , overhead tank pump, minimum 5000 litres with level indicators and piping layout , pipe bending machine hydraulic type 12mm to 30mm , pneumatic rivet gun , reciprocating pump working for dimantling and assembling , spring tension tester , submersible pump set, eight stage upto 10 kw per 1.5 hp , trolley type portable air compressor single cylinder with 45 litres capacity air tank , welding plant oxy acetylene complete high pressure , welding transformer 150-300 amps
Tender For supply, installation, testing and commissioning of opu (oil pressure unit) oil pump along with unloader valves and other associated necessary equipment of opu system for unit-1 hydro turbine of 2x50 mw karbi langpi hydro electric project, apgcl
Tender For supply of supply instll commissioning of machinery equipment for passion fruit proc unit on turnkey basis : : - raw water transfer pump , mineral dosing system , ro water treatment , pulping section , ss heating kettles , cold storage , sugar syrup preparation , sugar syrup storage tank , air compressor , dumping tank , blending tank , homogenizer , storage tank , pasteurizer , automatic rinsing , pet bottle blowing , date or batch coding , l shaped conveyor , box packing table , ss plumbing line , steam boiler , electrical control panel , seed oil extraction unit , quality testing laboratory set , effluent treatment plant , clean in place cip system , cooling tower
Tender For providing of custom bid for services - custom bid for services - annual maintenance contract for ground support equipment-work / schedule of requirement for maintenance, to be undertaken during period of amc, 1. adaptor maintenance stand pt no. 284557-1-1, 1.1, 1.2, 3.1, weekly inspection, 1.1.1 visually check the serviceability of item., 1.1.2 check cleanliness and husbandry state of the item., monthly inspection, 1.2.1 check visually condition of the item., 1.2.2 check condition of rubber beading., yearly inspection, 1.2.3 check item for operational condition., 1.2.4 painting of the item., 2. towing arm for dornier aircraft pt. no. misc-1512, 2.1 weekly inspection, 2.2, 2.1.1 visually check the serviceability of item., 2.1.2 check cleanliness and husbandry state of the item., 2.1.3 lubricate moving parts., 2.1.4 check the condition of wheel., monthly inspection, 2.2.1 clean and apply grease on moving parts., 2.2.2 check visually condition of the item., 2.2.3 check condition of wheel., 2.2.4 check condition of rubber beading., 2.3 yearly inspection, 2.3.1 check item for operational condition., 2.3.2 painting of the item, 3. nitrogen trolley with gauge pt. no. misc-5011, 3.1 daily inspection, 3.1.1 check for the general condition of the trolley., 3.1.2 check the n2 pressure available in bottle., 3.1.3 check for any static leak., 3.1.4 check all wheel for free rotation., 3.1.5 calibration of gauge when due., 3.2 weekly inspection, t 3.2.1 check the operational serviceability state of item., 3.2.2 check cleanliness and husbandry state of kit., 3.2.3 check for any leakage and erratic reading shown by pressure, gauges., 3.2.4 operate as per user manual and put appropriate label to indicate, the state., 3.2.5 check the condition of wheel., 3.2.6 check for pressure in cylinder and serviceability of gauges., 3.3 monthly inspection, 3.3.1 clean and apply grease on cylinder knob screw., 3.3.2 check visually the condition of hose., 3.3.3 test regulator for proper functioning., 3.4 yearly inspection, 3.4.1 check gauge for calibration, 3.4.2 check condition of wheel., 3.4.3 painting of whole unit., 3.4.4 calibration of hose., 4. jack adopter nlg pt no. u01a070000, 4.1 weekly inspection, 4.1.1 check cleanness and husbandry state of item., 4.1.2 check the serviceability state of item as per the user's manual., 4.2 yearly inspection, 7.1.1 painting of whole unit., 5. jack nose/main pt. no. vtej-3610, 5.1 daily inspection, 5.1.1 check the serviceability state of item as per the user's manual., 5.1.2 check for any signs of leak., 5.2 weekly inspection, 5.2.1 visually check the serviceability of the jack and wheels., 5.2.2 check cleanness and husbandry state of item., 5.2.3 lubricate the moving parts., 5.2.4 check the serviceability state of item as per the user's manual., 5.2.5 check the oil level port and plug., 5.3 monthly inspection, 5.3.1 replenishment of oil., 5.4 yearly inspection, 5.4.1 load testing (load testing is mandatory after, serviceability), 5.4.2 authority: - oem operation and maintenance manual., 6. jack tail pt. no. vaj-1.5/650, 6.1 daily inspection, major un6.1.1 check the serviceability state of item as per the user's manual., 6.1.2 check for any signs of leak., 6.2 weekly inspection, 6.2.1 visually check the serviceability of the jack and wheels., 6.2.2 check cleanness and husbandry state of item., 6.2.3 lubricate the moving parts., 6.2.4 check the serviceability state of item as per the user's manual., 6.2.5 check the oil level port and plug., 6.3 monthly inspection, 6.3.1 replenishment of oil., 6.4 yearly inspection, 6.4.1 load testing (load testing is mandatory after, serviceability), 6.4.2 authority: - oem operation and maintenance manual., 7. working platform engine pt. no. 63205a-000-000aoof, 7.1 weekly inspection, 7.1.1 visually check the serviceability of the item., 7.1.2 check cleanliness and husbandry state of item., 7.1.3 lubricate the moving parts., major un7.1.4 check the condition of the wheel along with the
Tender For supply of transformer oil testing kit (bdv) 1 kva/0-100 kv range motorized cum manual type (digital) for measuring break down voltage /dielectric strength of insulating oil used in transformer/other switchgears with complete accessories( test equipment, oil test vessel with mushroom electrode assembly, 2.5 mm go-no-go gauge, main ac cable of suitable length. user manual with test and warranty certificates) .technical specification as : input power ac 220-250 v/50 hz, output: 0-100 kv ac, trip current: max10-20 ma, operating temp: 10 to 50 degree centigrade humidity:<75% non considering, o/p voltage resolution: 0.1 kv, accuracy: +2% with digital display.