Get complete information related to latest Wagon Sale Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Wagon Sale Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Wagon Sale Tenders.
Tender For corrigendum : supply, erection and commissioning of high mast lighting tower system at coal handling plant-2 old stacker/reclaimer coal stockyard & wagon tippler railway yard area at ukai tps.(et- 6022 fuel)
Tender For corrigendum : custom bid for services -nesting, packeting, bundling and unitization of merchant mill products in merchant mill of bhilai steel plant-1 2008120152 steel straps - 0.79 thickness, specification for bundling, bundle unitization & wagon unitization as per scope of work, 2 4000014138 steel straps -1.27 thickness, specification for bundling, bundle unitization & wagon unitization as per scope of work, 3 2008120151 seal to lock tensioned 0.79 thickness straps during bundling, bundle unitization & wagon unitization as per scope of work, 4 4000014137 seal to lock tensioned 1.27 thickness straps during bundling, bundle unitization & wagon unitization as per scope of work, 5 4000014131 aluminium tag as per drw:mm-opr-4442, 6 4000014132 bundling to be done of merchant products as per scope of work confirming to indian railway guidelines, 7 4000014136 wagon unitization to be done as per scope of work conforming to indian railway guidelines (1 ea = one wagon), 8 4004020736 merchant products after being finished are being loaded by merchant mill as per the loading program movement plan given by marketing, cmo, shipping. this loading has to be done in minimum time to avoid any sort of demurrage/delays due to vehicles being held up. indian railways and rto s have stringent loading requirements vis- -vis the load balance on the transport vehicle(wagons, truck, trailor etc) which are to be complied with., 9 4004020764 cutting of merchant products in required length, blade changing, crop end bucket removal and first bay metal(arising less than 5.5mtr.) removal from both side of cold shear along with house keeping at both cold shear area of merchant mill., 10 5001070002 gas cutting of cobbles arising during production at both side of cooling bed, rope transfer, shear & craddels along with housekeeping in finishing area of merchant mill., 11 4001361133 payment on account of escalation of rates, as per the terms and conditions of the purchase order /tender..
Tender For providing of custom bid for services - load adjustment of over loaded wagons & making even (by distribution of material) of unevenly loaded wagons of loaded rakes, rake checking and securing wagon doors at nmdc kirandul railway yard
Tender For providing of custom bid for services - custom bid for services - rake decantation work; obhs and related service for railways (new version 2.0)-scope of work includes decantation of full/partially rake filled with petrol (ms) and diesel (hsd) into existing petrol (ms) and diesel (hsd) tanks through existing pumping and piping facilities by connecting of flexible hose in between tank wagon & piping header. 1. contractor has to available at site with his all manpower (total 10 nos. manpower) at least 30 minutes before placing of filled rake at omc siding. 2. necessary liasioning need to be done by contractor for rake placement with railway. 3. once the rake is placed at omc railway siding contractor has to check all seals, cover and number of wagons before connection of flexible hose pipe. 4. after checking the wagons contractor has to do sampling & qc (temperature, density and visual check of product) of all wagons in presence of bpcl officer. 5. once qc is over dipping of each wagon to be done in presence of bpcl officer. 6. after dipping of the wagons flexible hose connection need to do in between ms/hsd wagons and ms/hsd existing piping header respectively in presence of bpcl officer. 7. after hose connection contractor needs to start decantation of tank wagons through pumping into existing ms/hsd tank. 8. after starting of decantation of tank wagons one person should be present in siding pump house for operating & monitoring of pumps and one in tank farm for checking the level & changing of tanks until tank wagons are fully decanted. 9. once decantation over all wagon s emptiness needs to be checked and master valves & man way cover to be closed if wagons are empty. 10. after decantation flexible hose connection need to be removed and kept at specific location. 11. all bottom nozzles of wagons need to be closed properly with blind plate after hose disconnection. 12. release memo issued by bpcl officer need to be submit by contractor supervisor to aonla railway station. 13. all tools, tackles & equipment for the above job is in scope of vendor. 14. vendor has to use non-sparking tool for above jobs and all non-sparking tools is in scope of vendor. 15. all the above work needs to be complete within 8 hrs. if rake decantation delayed (beyond 8 hrs.) due to contractor issue, then demerge charged by railway need to be paid by contractor himself. 16. line drain needs to be done in ag/ug tank after decantation..
Tender For contract work for roh repair work of bogies and center sill repair work of wagons at wagon depot karachiya of vadodara division, western railway for a period of one year.
Tender For supplying and stacking of 60000 cum of machine crushed track ballast 50mm size from recognized quarry conforming to rdso's specification for track ballast in stack measurement and loading the same into any type of railway wagon at sirary (sry)ballast siding under danapur division
Tender For supplying and stacking of 75000 cum of machine crushed track ballast 50mm size from recognized quarry conforming to rdso's specification for track ballast in stack measurement and loading the same into any type of railway wagon at jhajha ballast siding under danapur division