Tender For tender for supply of certified reference materials for carbon and sulphur and gas analyzer - iron powder 150 g p/n 502-698 , steel pellet 1 g x 100 per bottle part no 502-863 , steel pin standard 1.0g p/n 502-893 , steel pin 0.5g x 100 per bottle p/n 502-904 , steel pin standard 1.0g p/n 502-916 , steel ring standard 1.0g p/n 502-918 , steel pin 0.5 g x 100 per bottle p/n 502-978 , steel pin 1 g x 100 per bottle part no 502-992 , titanium pin 0.12 g x 200 per bottle part no 503-507 , steel pin 1 g x 100 per bottle p/n 503-508 , steel pin 1 g x 100 per bottle part number-503-542 , steel pin 1 g x 100 per bottle part no 503-543 , steel pin 1 g x 100 per bottle part no 503-550 , titanium pin 0.12 g x 200 per bottle part no 503-558 , steel pin 0.5 g x 100 per bottle part no 503-525 , nickel chip 100 g part no 502-924 , steel pin 1 g x 100 per bottle part no 502-991
Tender For corrigendum : supply of steam wateranalysissystem main spares and e and c c c - ph sensor , ph transmitter 4 to 20ma hart , specific conductivity sensor , specific conductivity transmitter 4 to 20ma hart , cat ion conductivity sensor with 1 cat ion exchange column , cat ion conductivity transmitter 4 to 20ma hart , do2 sensor , do2 transmitter 4 to 20ma hart , silica analyzer transmitter 4 to 20ma multi channel , sodium analyzer transmitter 4 to 20ma multi channel , conductivity analyzer -online retractable type , sample handling system for main steam superheated , sample handling system for main steam saturated , sample handling system for drum water , sample handling system for hp feed water economizer inlet , sample handling system for deae ol fw , sample handling system for condensate cep outlet inlet cooling wtr , sample handling system for dm water , redundant chiller units 1 working 1 standby , shelf life items required at the time of commissioning , shelf life items required after commissioning in 1st lot , shelf life items required after commissioning in 2nd lot , training as per cl 14 of 6 mandays at manufacture works and 6 mandays at site , mandatory spares as per tech specs , supervision of e and c services charges at site , supervision of e and c visit charges
Tender For supply of nitrogen and sulphur analyzer , 1st year preventive maintenance visit , 2nd year preventive maintenance visit , 3rd year preventive maintenance visit , 4th year preventive maintenance visit , 5th year preventive maintenance visit
Tender For corrigendum : providing of repair and overhauling service - maintenance works of steam and wateranalysissystem, silica analysers of dm plant and conveyor belt weighing system of lhs in tps-ii; thermal power plant; no; buyer premises
Tender For corrigendum : supply of steam wateranalysissystem main spares and e and c - ph sensor , ph transmitter 4 to 20ma hart , specific conductivity sensor , specific conductivity transmitter 4 to 20ma hart , cat ion conductivity sensor with 1 cat ion exchange column , cat ion conductivity transmitter 4 to 20ma hart , do2 sensor , do2 transmitter 4 to 20ma hart material code , silica analyzer transmitter 4 to 20ma multi channel , sodium analyzer transmitter 4 to 20ma multi channel , hc analyzer 4 to 20ma , sample handling system for main steam superheated , sample handling system for drum water , sample handling system for hp feed water economizer inlet , sample handling system for deae ol fw , sample handling system for dm water , sample handling system for condensate blow down line , sample coolers , redundant chiller units 1 working 1 standby , shelf life items required at the time of commissioning , shelf life items required after commissioning in 1st lot , shelf life items required after commissioning in 2nd lot , training as per cl 14 of 2 mandays for 6 nos at site , supervision of e and c services charges at site , supervision of e and c visit charges , mandatory spares as per tech specs
Tender For providing of operation and maintenance power house / power plant - overhauling of forbes marshall make vapour compression type, 5.5 tr. twin circuit, water cooled chiller unit installed at steam and wateranalysissystem (swas),2x210 mw, btps ptpp during overhauling of unit #4.