Web Analytics Made Easy - StatCounter

Water Line Tenders

Get complete information related to latest Water Line Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Water Line Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Water Line Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government / Public Sector

CTN :43300276 Due date: 07 Jan, 202607 Jan, 2026 27.28 Lacs
Tender For dre125b155 lining up agency for installation of high volume long range hvlr fire monitors inside refinery and laying of drinking water line for new centralized transit accommodation

State Government

CTN :43301810 Due date: 31 Dec, 202531 Dec, 2025 2.18 Lacs
Tender For annual repair and maintenance of iei to non-residential buildings under cd, apwd, diglipur during 2025-26. sw- supply, installation, testing and commissioning of cctv surveillance system, 01 no. 800 va inverter and 01 no. 200 ah tubular battery at water supply section office, cd, apwd in r.k gram, diglipur

State Government

CTN :43325521 Due date: 03 Jan, 202603 Jan, 2026 24.44 Lacs
Tender For repairs to the guard room by replacing the doors, windows and sanitary fixtures, replacement of damaged water line, sump tank, overhead tank, repairs to the generator room in the premises of nyayagrama, hebbal, bangalore

State Government

CTN :43325548 Due date: 14 Jan, 202614 Jan, 2026 3.35 Lacs
Tender For repair of the drinking water pipeline and supplying pipeline for water supply for garden maintenance, and repair work on the portion of the compound wall of the inspection bungalow at k.r.pete town, mandya district (for cat-iia)

State Government

CTN :43285189 Due date: 29 Dec, 202529 Dec, 2025 20.37 Lacs
Tender For rws/ffc/sdrf/ndrf/restoration and repair of various water supply schemes namely dtw at hemshuklapara, dtw at laxmikanta karbari para, dtw at dhananjoy para, dtw at nabajaypara, iwrp at burshingpara, dtw at malakar basti, iwp at jamaroypara, dtw at ka

State Government

CTN :43285190 Due date: 29 Dec, 202529 Dec, 2025 24.24 Lacs
Tender For rws/ffc/sdrf/ndrf/restoration and repair of various water supply schemes namely iwp at tlakshi, iwp at vaisam, iwp at hmawngchuan, iwp at darkhuang, tlngsang water project, iwp at tankypara, iwp at vangmun, iwp at rulchhukkawn, iwp at behliangchip, i

corporations/Associations/Others

CTN :43285702 Due date: 30 Dec, 202530 Dec, 2025 5.30 Lacs
Tender For repair and replacement of 60hp turbine motor pump no 3 pump shaft gm bushes nrv lath work etc at vaigai water supply scheme raw water plant in theni - allinagaram municipality

corporations/Associations/Others

CTN :43326086 Due date: 30 Dec, 202530 Dec, 2025 35.70 Lacs
Tender For proposed laying of water line arrangements in 3mw, 2.50mw, mcc and mrf and 3mw to composed yard main road at chettichavadi in zone. ii in salem corporation.

corporations/Associations/Others

CTN :43261557 Due date: 26 Dec, 202526 Dec, 2025 7.15 Lacs
Tender For tiruppur corporation_z1_gf_maintenance and special repair work and providing and fixing of equipments tools and plants to the micro compost centre at athupalayam in ward no 10 - supply and fixing of sanitary napkin destroyer machine machine with storage capacity of 100 napkins per day with dimension of 220mm x 220mm x 360mm of wall mounting style no 1 pcs etc., complete., supply and fixing of pest controller of 64w with 360 inser killer etc., complete., dismantling the existing plain cement concrete including removing the debris from the site and stacking useful material at work site for reuse etc., complete complying with standard specification., earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete., plain cement concrete 1:4:8 [one cement, four m-sand and eight course aggregates] using 40mm size hard broken/machine crushed granite stone jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification., supply and delivery fixing of pvc chamber 2way 90 with cover size of 315mm x 110mm with chamber riser size of 315mm x 200mm including transporting etc.,, chambers, riser, plastering with cement mortar 1:4 mix (one cement four p-sand), 20mm thick in all floors using clean screened m-sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification., plastering with cement mortar 1:5 mix (one cement five p-sand), 12mm thick in all floors using clean screened m-sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification., painting two coats with ready mixed plastic emulsion paint (weather proof) of approved quality and colour over a priming coat, including thorough scraping, clean removal of dirt and including necessary plaster of paris, putty wherever required etc., complete as per standard specifications., wring with 2 x1.5 sqmm (22/0.3) pvc insulated sc unsheathed cu conductor of 1100v grade in suitable pvc rigid pipe concealed in wall and ceiling with pvc accessories in flush with wall with 3mm thick hylum sheet cover with tw switch box and 5a f.t switch with continous earth wire connection of 14 swg tc wire for making good of the concealed portion with suitable color of pvc concealed light point / fan point (for electronic regulator ), supply and fixing of 200w 4 feet led fitting as per standard specificatin., supply and fixing of 1200mm (48") sweep ac ceiling fan complete with stepped electronic 300w regulator with 1 metre down rod with fan clamp with side plates and cross arm of size 450mm (18")., supply and fixing of wall mounting 450mm sweep fan etc.,, supply and fixing of roof ventilator fan etc.,, replacement of underground utilities hdpe pipe damaged during earthwork excavations for pipe laying works including cost of additional earthwork excavation in all soils, including bt cutting, cc roads , removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of hdpe pipes, couplers, jointing materials and required specials, cutting, threading, conveying , laying, jointing and

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
 Loading, Please wait...

Connect us via What's Up