Web Analytics Made Easy - StatCounter

Water Softener Tenders

Get complete information related to latest Water Softener Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Water Softener Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Water Softener Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44675992 Due date: 01 May, 202601 May, 2026 30.22 Lacs
Tender For corrigendum : providing of custom bid for services - operation & annual maintenance contract of water softener plants at nit andhra pradesh

State Government

CTN :44952980 Due date: 29 Apr, 202629 Apr, 2026 21.99 Lacs
Tender For a/r & m/o water supply under sd-1, cd. apwd, car nicobar.sub work:-supply of ef-chlor for chlorination. the materials should be supplied at apwd store at car nicobar.

State Government

CTN :44940438 Due date: 29 Apr, 202629 Apr, 2026 33.44 Lacs
Tender For annual operation comprehensive maintenance of stp/etp/wtp water softener plant ( for one year ) at super speciality hospital at nscb medical college, jabalpur

CTN :44772284 Due date: 14 Apr, 202614 Apr, 2026 1.92 Crore
Tender For corrigendum : supply, installation, testing and commissioning of water softener plant in administrative building complex supreme court new delhisubwork/packages:provision of softener plant in hvac system i/c comprehensive maintenance and operation work along with consumable items

State Government

CTN :44814707 Due date: 23 Apr, 202623 Apr, 2026 50.43 Lacs
Tender For regular inspection maintenance greasing chlorination water sample collection and other allied maintenance work of 1750 handpump of 205 villages in block-kurwai distt.vidisha for 2 years.

State Government

CTN :44823131 Due date: 13 Apr, 202613 Apr, 2026 12.46 Lacs
Tender For corrigendum : tggenco-ytps (5x800 mw)-bop-ii-preventive electrical maintenance works related to ac nldb, ac wrdb, lighting, welding power supplies and its connected equipments in the common area of bop/water system/ stage-i/ytps (5x800 mw) such as raw water pump house, clarifier, cpu, foph, rail unloading (foph), pt plant, fire water pump house, foam pump house, and raw water chlorination plant etc., in bop area from 01.04.2026 or from the actual date of commencement of work to 31.03.2027 for the f.y 2026-2027.

Corporations And Associations And Others

CTN :44349360 Due date: 16 Apr, 202616 Apr, 2026 NA
Tender For corrigendum : nagar panchayat kulpahad re-organization water supply scheme - survey, soil investigation, engineering design/drawaing, supply of all materials, labour, t&p etc. required for completion of following works of “nagar panchayat kulpahad re-organization water supply scheme” on turn-key basis: construction, erection, completion, testing & commissioning of water supply works such as: intake well (14.5 mld) cum pump house & approach bridge and associated works.wtp 9 mld capacity and its associated works, raw water rising main from intake well to wtp. rcc ohts, zpss/cwr cum pumping station, rising main, feeder main, distribution system, drinking water house connection, scada room, chlorination room, meter room, panel room, staff quarter, boundary wall & site development works etc. and other appurtenant works including scada and automation as per specifications in tender document for “nagar panchayat kulpahad re-organization water supply scheme” the scope of work includes commissioning, testing, trial run of 3 months & defect liability period of 12 months for civil works & 24 months for e/m works after completion of successful trial run. all completed and commissioned work under under “nagar panchayat kulpahad reorganization water supply scheme” shall be hand over to chitrakoot dham mandal jal sansthan, district- mahoba(u.p.) after 3 month successful trial run period.

State Government

CTN :44722231 Due date: 08 Apr, 202608 Apr, 2026 6.70 Lacs
Tender For maintenance of existing water softeners of capacity 20000 lpd at spf hostel, g 4 project hostel, 24 single bhk quarters and a and b type blocks and maintenance of ro plants of capacity 250 lph at spf hostel and g 4 project hostel buildings and daily monitoring water distribution system for above buildings at btps from april 2026 to december 2026

corporations/Associations/Others

CTN :44726895 Due date: 17 Apr, 202617 Apr, 2026 NA
Tender For annual rate work related to chlorination at the municipal water source, repairing, maintaining, operating the dosing system, supplying sodium hypochlorite (40 to 60 gpl), carrying out chlorination testing at the borehole and at the point of supply, and maintaining records.

State Government

CTN :44726899 Due date: 09 Apr, 202609 Apr, 2026 33.60 Lacs
Tender For producing potable water as desirable standards from malekpur main head works of hindoliya regional water supply scheme by proper operation and maintenance of conventional water treatment plant at malekpur mhw including all civil works, pipe system channels, all consumable, incl. proper chlorination, skilled and unskilled manpower, material, t & p articles, vehicles, all type of valve chamber, and water meter for continuous running of filter plants round the clock, with uninterrupted pumping of treated water from malekpur main head works to various sub headworks. proper operation and maintenance of different class, type and diameter pipes, pump houses, sumps, rcc esr/stand pipes, sluice valves, non return valve. at all these head works. replacement spares all equipments and maintenance of civil structures etc. including supply sufficient potable water to villages included in the scheme with residual chlorine of required ppm at bulk supply point including all type of brake down works for civil works. providing sufficient no. of supervision skilled and unskilled labours and providing security for all head works sites, pipeline etc for overall management of o&m work of whole scheme based on mahi river for 70 villages and their habitation for 24 hours for 5 months periods. (without pumping machinery)
 Loading, Please wait...

Connect us via What's Up