Tender For supply of deluge valve of ict and laying of fire hydrant lin c c - laying of ms pipe 100 mm of hydrant system including cutting, and welding etc. and commissioning the line at 6 to 8 kg per cm2 , laying of ms pipe 200 mm of hydrant system including cutting, and welding etc. and commissioning the line at 6 to 8 kg per cm2 , making of ms bend, tee, and reducer including cutting welding work of following size pipes 100 mm dia. , making of ms bend, tee, and reducer including cutting welding work of following size pipes 200 mm dia. , fixing of ms bend, tee, and reducer of following sizes pipe. 100 mm dia. , fixing of ms bend, tee, and reducer of following sizes pipe. 200 mm dia. , fixing of ms flange on the hydrant system, pipe line by cutting , welding and grinding etc. of following dia size. 100mm dia. , fixing of ms flange on the hydrant system pipe line by cutting, welding and grinding etc. of following dia size 200mm dia. , dismantling of ci gate valve of following sizes with the help of nuts and bolts 100 mm dia. , dismantling of ci gate valve of following sizes with the help of nuts and bolts 150mm dia. , fixing of ci gate valve of following sizes with the help of nuts and bolts. 100 mm dia. , fixing of ci gate valve of following sizes with the help of nuts and bolts. 150mm dia. , dismantling of ms,ci,gi pipe line from the hydrant system by loosening of nuts and bolts by cutting and transportation of following sizes. 200mm dia. , fabrication of hydrant valve post of ms pipe dia. 80mm one mtrs. long and welding with ms flange 80mm dia. it should be painted with red oxide and finally with red paint. , fixing of hydrant post of 80mm pipe line of hydrant system with the help of nut and bolts , dismantling of rcc,cc metallic road for taking out the damaged pipe for replacement of pipe and filling the same up to proper level of the earth. , earth work by excavation of ordinary,mixed soil,mixed with bujari, bolders etc. , painting of 200,150 and 100mm dia. , making and fixing of pipe stand for supporting and clamping 150mm dia ms pipe , unloading,shifting,stacking of materials supplied by suppliers and laying in store , replacement of 65,80,100,150 nb size deluge valve or alarm valve of fire fighting system
Tender For providing of custom bid for services - loading unloading welding laying jointing of 8inch and 12inch pipes from b1 sump via hoe coal face towards 26 no coal stock at sasti ocm of ballarpur area
Tender For labour charges for laying, jointing and dismantling of 200mm od ms pipes at pit-i, kocp, yellandu area, bk dist. ("invited under earmarked works - sccl registered contractors belong to sc community are eligible to participate")
Tender For providing of facility management services - lumpsum based - industrial; special repair no 1 providing and applying one coat of acrylic emulsion paint of approved make and shade with rolled finish as per manufacturers instruction to the internal plastered surfaces for walls ..,facility management services - lumpsum based - industrial; special repair no 2 providing and applying two coats of acrylic emulsion paint of approved make and shade over a coat of approved cement primer with rolled finish as per manufacturers instruction to the ..,facility management services - lumpsum based - industrial; special repair no 3 providing, fabricating and fixing miscellaneous structural steel grills, gates and other structural items etc, made out of square rods, flats, plates, angles, hollow pipes, channels ..,facility management services - lumpsum based - industrial; special repair no 4 providing and laying designer concrete tile flooring (using eurocon / ultra / duracrete make or approved equivalent type and make) of approved colour and design over 20mm thick cement..,facility man
Tender For supply of fabrication and construction of copper plate earthing details of electrodes and earth pit at akashvani rampur, uttar pradesh , interconnecting earth electrodes with providing, fabrication and fixing of 50mmx3mm copper strip at akashvani rampur, uttar pradesh , copper strip laying for extension of earthing system up to the xtr hall, ups and lt panel and terminating in bus bar by digging the soil and placing the copper strip along the trenches at air rampur , providing of 375x38x6mm copper bus bar with insulators and steel nut bolts and the fixing of 375x38x6mm copper bus bar is to be done to terminate the different earthing system at akashvani rampur. , providing and fixing of nomenclature sign marker for earth pits at akashvani rampur, uttar pradesh , digging of trenches of size 450mmx600mm total length 118mtr for 185 sq mm 3.5core and starting from electricity board energy meter to lt panel inside room and to respectively by digging the path , providing and grouting of 2 nos. of 3inch dia g.i pipes of different length on the cement concrete flooring and along the vertical walls. total length of both pipes is 27 mtr. , providing, grouting and fixing 2 nos. of 4inch dia g.i pipes along the ms stand of main mccb at energy meter. total length of both pipes is 14 mtr. , unwinding roll of 185 sq mm 3.5core al. cable from the cable drum and laying 2 length of this power cable through the trenches and through the gi pipes as laid down at akashvani rampur , reconstructing the cc flooring and repairing the area with cement concrete and stone aggregate mixer and finishing the surface, complete in all respect at akashvani rampur , providing and fixing of lt cable route marker made up of 2.5inch dia signage with 10mm x 2ft long ms rod at akashvani rampur, uttar pradesh fabrication and construction of copper plate earthing details ) /bid number : gem/2026/b/7445375 * /dated: 24-04-2026 & & / bid document 1 / 22