Tender For corrigendum : construction of balance physical infrastructure such as internal roads, storm water rains, watersupply, sewerage network, septic tank etc., in the approved layouts at pamidi, gooty, hindupur, puttaparthi, kadiri, anantapuramu and rayadurgam in anantapur district under phase-ii& iii ahp-pmay-hfa (u) with 2 years defect liability period under lump sum contract
Tender For corrigendum : construction of balance infrastructure such as internal roads, storm water drains, watersupply, sewerage network, court yard filling, trunk mains etc., in the approved layouts at sattenapalli and tenali ii ulb s in guntur district in andhra pradesh under ahp pmay hfa(u) with 2 years defect liability period under lump sum contract.
Tender For corrigendum : construction of balance infrastructure such as internal roads, storm water drains, watersupply, sewerage network, court yard filling, trunk mains etc., in the approved layouts of nuziveedu, vuyyuru ulbs in krishna district and jaggayapeta, tiruvuru, nandigama ulbs in ntr district and addanki in bapatla district and kanigiri, giddalur ulb s in prakasam district in andhra pradesh under ahp pmay hfa (u) with 2 years defect liability period under lump sum contract.
Tender For providing and laying of sw pipe line 200mm dia and repair and construction of sewer manhole near bilss hospital and shopping complex front side suncity and other various points in sector 20 panchkula
Tender For estimate for providing and laying rmc m-25 grade and p/l 300mm s.w. pipe sewer line in c-block, bhatia colony near vidya sagar school in ward no. 43 ballabgarh.(recall)
Tender For providing and laying of 200mm. 300mm, 450mm dia s.w. pipe sewer line at various streets in pocket 1 from g-266 to g-500, block g, sgm nagar in ward no.17 (new ward), badkhal constituency, faridabad.(recall)
Tender For work of operation, repair and maintenance of watersupply, sewerage, storm and fire fighting system of purab premium apartments, sector-88, sas nagar (for period 01-04-2026 to 31-03-2027)
Tender For corrigendum : construction of 04 nos. hig, 14 nos. mig & 25 nos. lig houses, 41 nos. ews houses including external development work (rcc road, rcc culvert, watersupply,sump well,pump house, septic tank,watersupply, sewerage ling, low laying area ,ramp ,garden ) under general scheme at deorikhurd phase-iii, bilaspur (c.g.)