Web Analytics Made Easy - StatCounter

Water Treatment Plant Work Tenders

Get complete information related to latest Water Treatment Plant Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Water Treatment Plant Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Water Treatment Plant Work Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39144217 Due date: 06 Mar, 202506 Mar, 2025 NA
Tender For corrigendum : supply of liquid chlorine for raw water pre-treatment & cooling water treatment and for drinking water system in phased manner for a period of one year at godavari gas power plant, jegurupadu

State Government

CTN :39433347 Due date: 28 Feb, 202528 Feb, 2025 3.22 Lacs
Tender For operation and maintenance water supply schemes cwss to varkala and adjoining villages conveyance of chlorine cylinder for refilling to tcc kochi and after refilling back to treatment plant mullasserikunnu

State Government

CTN :39433847 Due date: 27 Feb, 202527 Feb, 2025 32.4 Thousand
Tender For oandm water supply schemes mace of carwss to ranni pazhavangadi and vadasserikkara desilting and washing the clariflocculator no2 with flash mixer and sump in the water treatment plant and ohsr at anapparamala ranni ir no 1603670 pipeline work

State Government

CTN :39266148 Due date: 07 Feb, 202507 Feb, 2025 75.41 Crore
Tender For corrigendum : design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under "har ghar nal ka jal" nischay in areas having ground water quality issues, with electric driven pumps and iron removal treatment plant having technology (adsorption/ nano technology) of csir or certified by csir or any other technology endorsed/ approved by goi in the district of supaul, bihar on turn-key basis with 6 months trial run after commissioning and comprehensive operation and maintenance of 60 months after successful completion of trial run period under mukhyamantri gramin peyjal nishchay yojna (quality affected) under p.h.division, supaul. block- pratapganj, panchayat-chiloni south, ward no-3(a), 8(a), 9(a), 10(a), 11(a), 14(a), panchayat-chiloni uttar, ward no-1(a), 3(a), 4(a), 6(a), 7(c), 8(a), 9(c), 10(a), 14(a), panchayat-shripur, ward no-2(a), 3(a), 3(b), 3(c), 4(a), 5(a), 7(a), 10(a), 11(a), 12(a), panchayat-bhawanipur north, ward no-1(a), 3(c), 4(a), 4(b), 6(a), 7(a), panchayat-bhawanipur south, ward no-8(a), panchayat-govindpur , ward no-1(a), 3(a), 13(c), panchayat-sukhanagar, ward no-1(a), 2(a), 3(a), 4(a), 6(a), 8(a), 11(a), 12(a), 13(a), panchayat-suryapur, ward no-3(a), 5(a), 7(a), 9(a), 11(a), 13(a), 14(c), panchayat-tekuna, ward no-3(a), 4(a), 9(c), 9(d), 10(c), 12(a), block-basantpur, panchayat-ratanpur, ward no-2(a), 4(c), panchayat-satanpatti, ward no-2(a), 3(a), 4(a), 4(b), 5(a), 7(a), 9(a), 11(a), 12(a), 14(a), panchayat-bhagwanpur, ward no-2(a), 3(a), 4(a), 5(a), 7(a), 8(a), 9(a), 9(b), 10(a), 13(a), 14(a), panchayat-bhimnagar, ward no-4(a), 4(b), 11(a), 11(b), 12(a), 12(b), 13(a), 13(b), 15(a), panchayat-basantpur, ward no-1(c), 1(d), 3(a), 4(a), 5(a), 6(a), 7(a), 7(b), 8(a), 14(a), panchayat-balbhadarpur, ward no-2(a), 3(a), 5(a), 12(a), 13(a), 14(a), panchayat-kochgama, ward no-2(a), 7(c), 13(a), 14(a) , panchayat-parmanandpur, ward no-1(c), 1(d), 2(a), 4(a), 4(b), 5(a), 9(a), 10(c), 10(d), 12(a), 14(a), 14(b), panchayat-banelipatti, ward no-1(a), 4(a), 9(a), 11(a), panchayat-hirdaynagar, ward no-2(a), 4(a), 5(a), 7(a), 9(a), 10(a), 11(a), 12(a), 14(a), panchayat-dinbandhi, ward no-2(a), 4(a), 5(a), 7(a), 8(a), 9(a), 10(a), 13(a), panchayat-bishanpur shivram, ward no-1(a), 2(a), 2(b), 5(a), 7(a), 8(a), 9(a), 10(a), 12(a), 13(a), panchayat-kushar, ward no-3(a), 4(a), 6(a), 7(a), 8(a), 11(a), panchayat-nirmali, ward no-1(a), 6(c), 13(a) total 161 scheme..

State Government

CTN :39266149 Due date: 07 Feb, 202507 Feb, 2025 28.78 Crore
Tender For corrigendum : design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under "har ghar nal ka jal" nischay in areas having ground water quality issues; with electric driven pumps and iron removal treatment plant having technology (adsorption/ nano technology) certified by csir or any other institute of national repute. in block- banmankhi (71 schemes as per annex-i) of district purnea , bihar on turn-key basis with 6(six) months trial run after commissioning and comprehensive operation and maintenance of 60 months after successful completion of trial run period under mukhyamantri gramin peyjal nishchay yojna (quality affected) under p.h.division, dhamdaha.

State Government

CTN :39266150 Due date: 07 Feb, 202507 Feb, 2025 8.19 Crore
Tender For corrigendum : design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under ?har ghar nal ka jal? nischay yojna in areas having ground water quality issues; with electric driven pumps and iron removal treatment plant having technology (adsorption/ ion exchange/ membrane/ nano technology/etc.) certified by csir or any other institute of national repute. in the district of purnea bihar on turn-key basis with 06 months trial run period and comprehensive operation and maintenance of 60 months under mukhyamantri grameen peyjal nishchay yojna (quality affected), in gp- chickni dumaria (4b, 5b, 6b, 12b), parasmani (8b, 12b), rajghat garail (6b, 11b), dameli (5b, 12b), sarsi (5b), mogalia purandaha west (8b, 16b), mogaliya purandha east (14b, 16c), and rangpura south (1b, 2b, 2c, 4b, 5b, 5c, 10b) of block- dhamdaha (total- 22 nos. schemes) under p.h. division, dhamdaha

State Government

CTN :39266151 Due date: 07 Feb, 202507 Feb, 2025 27.28 Crore
Tender For corrigendum : design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under ?har ghar nal ka jal? nischay yojna in areas having ground water quality issues; with electric driven pumps and iron removal treatment plant having technology (adsorption/ ion exchange/ membrane/ nano technology/etc.) certified by csir or any other institute of national repute. in the district of purnea bihar on turn-key basis with 06 months trial run period and comprehensive operation and maintenance of 60 months under mukhyamantri grameen peyjal nishchay yojna (quality affected), in gp-goripur (3b,7b,9b,10b,11b,12b), nathpur (2b, 3b, 4b, 12b, 13b, 14b), laxmipur (1b, 5b, 12b), mathihani (1b,5c,6b,7b, 8b,11c,12), bhatsara (7b, 11b), mulikiya (1b,5b,6b,7b, 8b,10b,13b, 14c),basudeopur ( 11b,12c),aurahi (1b, 5b, 7b), barhara (1b,3c,5b,8b), latraha (1b,2b,4b,5b, 6b,7b,8b,9b,10b,11b,13b),nipaniya (2b,3b,4b,7b,10b), sukhsena east (2b,3b,4b,5b,11b) of block b.kothi (total- 62 nos. schemes) under p.h. division, dhamdaha

State Government

CTN :39266152 Due date: 07 Feb, 202507 Feb, 2025 8.19 Crore
Tender For corrigendum : design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under ?har ghar nal ka jal? nischay yojna in areas having ground water quality issues; with electric driven pumps and iron removal treatment plant having technology (adsorption/ ion exchange/ membrane/ nano technology/etc.) certified by csir or any other institute of national repute. in the district of purnea bihar on turn-key basis with 06 months trial run period and comprehensive operation and maintenance of 60 months under mukhyamantri grameen peyjal nishchay yojna (quality affected), in gp- bardela (5b, 9b, 11b, 15b), bishanpur (2c, 5b, 6b, 9b, 12), ithari (11b, 11c, 13b), kishanpur balwa (3b, 6b, 7b), and kuwari (2b, 6b, 17b, 18b) of block- dhamdaha (total- 19 nos. schemes) under p.h. division, dhamdaha

State Government

CTN :39266142 Due date: 07 Feb, 202507 Feb, 2025 85.97 Crore
Tender For corrigendum : design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under "har ghar nal ka jal" nischay in areas having ground water quality issues, with electric driven pumps and iron removal treatment plant having technology (adsorption/ nano technology) of csir or certified by csir or any other technology endorsed/ approved by goi in the district of supaul, bihar on turn-key basis with 6 months trial run after commissioning and comprehensive operation and maintenance of 60 months after successful completion of trial run period under mukhyamantri gramin peyjal nishchay yojna (quality affected) under p.h.division, supaul. block:- chhatapur, panchayat-balua, ward no-1(c), 3(a), 4(a), 6(a), 7(a), 9(a), 10(a), 11(a), 13(a), 15(a), panchayat-bhimpur, ward no-2(c), 8(c) , 8(d), 10(a), 11(c), panchayat-laxminiya, ward no-2(a), 5(a), 5(b), 7(a), 11(c), 13(c), 14(a), panchayat-madhubani, ward no-3(c), 5(c), 10(a), 13(c) panchayat-thuthi, ward no-1(a), 2(a), 3(a), 3(b), 4(a), 4(b), 5(a), 5(b), 6(a), 8(a), 12(a), 12(b), 13(a), panchayat-jiwachpur, ward no-1(a), 2(a), 3(a), 15(a), panchayat-udhampur, ward no-1(a), 4(a), 4(b), 4(c), 6(a), 7(a), 12(a), 12(b), panchayat-madhopur, ward no-4(a), 6(a), 10(a), 12(a), panchayat-chhatapur, ward no-1(a), 4(a), 5(a), 8(a), 9(a), 11(a), 17(a), panchayat-lalganj, ward no-1(a), 2(a), 3(c), 5(c), 6(a), 8(a), 9(c), 10(a), 12(a), 15(c), panchayat-jhakhargardh, ward no-1(a), 2(a), 3(a), 4(a), 8(a), 10(a), 11(a), panchayat-laxmipur khuti, ward no-1(c), 2(a), 3(a), 5(a), 6(c), 7(a), 8(a), 9(a), 10(a), panchayat-dahariya, ward no-1(a), 2(a), 3(a), 4(a), 5(a), 6(a), 7(a), 9(a), 11(a), panchayat-ghiwha, ward no-1(a), 4(a), 5(a), 8(a), 10(a), panchayat-rampur, ward no-1(a), 2(a), 3(a), 4(a), 5(a), 6(a), 9(a), 10(a), 11(a), 12(a), 12(b), 13(a), 14(a), 15(a), 15(b), 16(a), panchayat-kathara, ward no-2(a), 4(a), 5(a), 6(a), 8(a), 9(a), 10(a), 12(a), panchayat-chunni, ward no-1(a), 5(a), 8(a), 8(b), 8(c), 13(a), 15(a), panchayat-sohata, ward no-1(a), 1(b), 2(a), 4(a), 5(a), 6(a), 10(c), 11(a), 11(b), 12(a), panchayat-charne, ward no-1(a), 3(a), 6(a), 7(c), 8(a), 9(c), 10(a), panchayat-gwalpara, ward no-3(a), 5(a), 6(a), 8(a), 8(b), 10(a), 11(a), 12(a), 13(c), 14(a), panchayat-mohammadganj, ward no-1(a), 2(a), 5(a), 6(a), 7(a), 11(a), 13(a), 14(a), panchayat-rajeshwari puravi, ward no-2(a), 6(a), 7(a), 8(a), 10(a), 11(a), 12(a), 13(c), panchayat-rajeshwari west, ward no-1(a), 4(c), 12(a), 13(a) total 180 scheme..

State Government

CTN :39266143 Due date: 06 Feb, 202506 Feb, 2025 54.46 Crore
Tender For corrigendum : design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under har ghar nal ka jal nischay yojna in areas having ground water quality issues; with electric driven pumps and iron (strike off irrelevant impurity) removal treatment plant having technology (adsorption/ ion exchange/ membrane/ nano technology/etc.) certified by csir or any other institute of national repute. in aashiyani, malopara, nandaniya, raiber, routa, sishabari, baluwagostra, chandwar, chandel, dhusmal, kanfaliya, kanjiya, khapra manjhok, mungrapiyaji, sirsi panchyat of baisa block and aamgachi, adhang, bakeniyabreli, barbatta, bengramehdipur, dahuwabari, dalmalpur, jhowari, dhurpeli, machatta, majhuwa hat, bishanpur, tiyarpara, bara idgah, bhawanipur, dahuwabari, gyandov, hafaniya, haripur, kharaiya, khari mahingown, nitendar, rangraiya lal toli, talbari, tiyarpara panchyat of amour block (total-135nos. schemes) in the district of purnea, bihar on turn-key basis with 06 months trial run period and comprehensive operation and maintenance of 60 months under mukhyamantri grameen peyjal nishchay yojna (quality affected) under p.h. division, purnea.
 Loading, Please wait...

Connect us via What's Up