Get complete information related to latest Welding Socket Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Welding Socket Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Welding Socket Tenders.
Tender For tender for supply of labour charges for changing of engine oil by replacement of mobil oil-04.2ltrs , mobil filter-01no , 01 set petrol filter-01no , air filter including chamber oil leakage repairing by replacement of -01no , chamber joint and complete testing. , labour charges for complete seat cover making stitching with best quality foam , u foam , rexine leather , markin cloth and fitting properly on all seats including hand rest making stitching fitting. , labour charges for complete floor mat stitching fitting by best quality rexine cloth & foam etc. , labour charges for repairing of complete front axle including replacement of following parts make maruti suzuki joint assy axle shaft (rhs) 01 set , joint assy axle shaft (lhs) 01 set , front axle housing 1 no. , oil seal 02 set , spindle front wheel 2 nos. , bush 2 nos. including all fitting and testing. , labour charges for repairing of oil leakage repairing including replacement of following parts make maruti suzuki oil pan 1 no. , oil pan bolt lower 16 nos , timing belt 1 no. including all fitting & testing , labour charges for repair to king pin system and replacment of 04 nos. king pin bearing , 02 nos. knuckle kit , 04 nos. wheel bearing (front) , 02 nos. wheel bearing (rear) , including greasing and testing. , labour charges for wiper system repairing by replacement of 01 no. wiper motor with linker , 01 set wiper arm with blade including dashboard incluidng complete testing , labour charges for silencer repairing by welding with plate and changing of 02 nos. silencer mounting , 04 nos. nut bolt including complete and testing , supply of engine 20w 40 oil , supply of oil filter , supply of air filter , supply of coolant , supply of distilled water , supply of rexine cloth , supply of foam 10mm , supply of marking cloth , supply of dendrite , supply of rexine srf , supply of poli foam , supply of marking cloth , supply of joint assy axle shaft (rhs) , supply of joint assy axle shaft (lhs) , supply of front axle housing , supply of oil seal , supply of spindle front wheel , supply of bush , supply of oil pan , supply of oil pan bolt lower , supply of timing belt , supply of king pin bearing , supply of knuckle kit , supply of wheel bearing (front) , supply of grease , supply of wiper motor with linker , supply of wiper arm with blade , supply of silencer mounting , supply of silencer bolt
Tender For tender for supply of taking down complete toyo load spring leaf from back side including welding to hanging or bracing assembling and replacing worn out safety pin , bolt and nut including replacing new load spring leaf including testing and commissining tempering the or suspension level of vehicle. lifting jack used for replacing the load spring leaf for lifting for reepairing work as specified. , complete floor mat stitching fitting by best quality rexine cloth & foam etc. , repairing of complete front axle including replacement of following parts make maruti suzuki joint assy axle shaft (rhs) 01 set , joint assy axle shaft (lhs) 01 set , front axle housing 1 no. , oil seal 02 set , spindle front wheel 2 nos. , bush 2 nos. including all fitting and testing. , repairing of oil leakage repairing including replacement of following parts make maruti suzuki oil pan 1 no. , oil pan bolt lower 16 nos , timing belt 1 no. including all fitting & testing , repair to king pin system and replacment of 04 nos. king pin bearing , 02 nos. knuckle kit , 04 nos. wheel bearing (front) , 02 nos. wheel bearing (rear) , including greasing and testing. , wiper system repairing by replacement of 01 no. wiper motor with linker , 01 set wiper arm with blade including dashboard and replacing rubber feeding of window glass bracer -04nos incluidng complete testing and commissioning. , silencer repairing by welding with plate and changing of 02 nos. silencer mounting , 04 nos. nut bolt including complete and testing , taking down complete load shocker from front side including welding to hanging or bracing assembling and replacing worn out safety pin , bolt and nut including replacing new shocker including testing and commissining of suspension level of vehicle. lifting jack used for replacing the suspension shocker for lifting for reepairing work as specified. , supply of load spring leaf , supply of spring suppport assy , supply of shocker front , supply of dendrite , supply of joint assy axle shaft (rhs) , supply of joint assy axle shaft (lhs) , supply of front axle housing , supply of oil seal , supply of spindle front wheel , supply of bush , supply of oil pan , supply of oil pan bolt lower , supply of timing belt , supply of king pin bearing , supply of knuckle kit , supply of wheel bearing (front) , supply of grease , supply of wiper motor with linker , supply of wiper arm with blade , supply of silencer mounting , supply of silencer bolt , supply of rubber bracer of window glass
Tender For lt-02/24-25 of se/gcc-ii - supplying, fabricating, galvanizing, transporting of gi towers parts including stub and cleat extension parts, cost of all materials labour lead lift etc., complete for the 230 kv dc towers. (ms parts), supplying and tranporting of gi bolts, nuts, washers etc., for towers, extensions, cross arms et., including of all materials labour lead lift etc., complete., supplying , transporting of hardware fittings for conductor and earth wire including cost of all materials labour lead lift etc. complete. - ss fittings for zebra., supplying , transporting of hardware fittings for conductor and earth wire including cost of all materials labour lead lift etc. complete. - st fittings for zebra., supplying , transporting of hardware fittings for conductor and earth wire including cost of all materials labour lead lift etc. complete. - vibration dampers for zebra., supplying , transporting of hardware fittings for conductor and earth wire including cost of all materials labour lead lift etc. complete. - midspan joint for zebra., supplying , transporting of hardware fittings for conductor and earth wire including cost of all materials labour lead lift etc. complete. - repair sleeve for zebra., supplying , transporting of hardware fittings for conductor and earth wire including cost of all materials labour lead lift etc. complete. - pa road for zebra., transportation & installation of pipe type earthing , earthing for towers including cost of all t&p labour, lead, lift etc., complete as directed by the engineer., transportation and installation of danger plate including cost of all t&p, labour, lead lift etc., complete as directed by the engineer., transportation and installation of number plate including cost of all t&p, labour, lead lift etc., complete as directed by the engineer., transportation and installation of phase plate (set of three) including cost of all t&p, labour, lead lift etc., complete as directed by the engineer., transportation and installation of name plate (set of two) including cost of all t&p, labour, lead lift etc., complete as directed by the engineer., transportation and installation of circute plate (set of two) including cost of all t&p, labour, lead lift etc., complete as directed by the engineer., transportation and installation of anti-climbing device (set of four) including cost of all t&p, labour, lead lift etc., complete as directed by the engineer., labour charges for erection of towers and tower extensions including sorting out of tower parts, tightening, punching of bolts and nuts and rectification of defects if any during erection, one coat of zinc rich primer, 2 coats of zinc rich enamel paint, cost of all materials, labour, lead, lift etc., complete., welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting with good quality of zinc paint on the welded portion etc., complete., labour charges for paying out, rough sagging, tensioning of 6 nos. zebra conductor with fittings including transport, sorting out of conductor according to drum schedule and loading and unloading at site, providing trussels and rough sagging, tensioning, clipping, labour, providing vibration dampers including giving jumper connections, cost of t&p, lead and lift etc., complete under lc., transporting, erection, testing and commissioning of 1no. opgw 48wire including fixing of hardware fittings and accessories etc., complete (stringing of opgw is to be done using tension stringing equipments), labour charges for transporting and hoisting of 120 kn polymer insulators including cost of all tension fittings, all materials, labour, lead, lift, etc., complete under lc condition., labour charges for transporting and hoisting of 90 kn polymer insulators including cost of all tension fittings, al
Tender For rate tender work for two years as per the terms of tender for supply of spare parts and repair work of tata vehicles/machines of jodhpur municipal corporation north garage branch. water separator opening and fitting , hydraulic distributor opening and fitting work , air compressor head repair , compressor repair job work , engine cylinder head repair , clutch booster repair job work , clutch plateset openingand fitting , pressure plate repairing work , engine mounting work , engine foundation pad opening and fitting , engine opening and fitting , engine over hauling complete job work , cabin mounting opening and fitting , fuel pump complete repair job work , fuel pump calibration , hydraulic pump seal kit and repair work , turbocharger complete repair job work , wheel opening greasing and fitting each , wheel balancing and alignment , shock absorber reapir work , complete nipple greasing , front wheel drum repair each , rear wheel drum repair each , brake liner shoe changing each set , bumper opening repairing and fitting , front leaf pin bush fitting , front leaf shackle fitting , gear top opening and fitting , gear opening & fitting , nozzle repairing work , front leaf opening fitting and tensioning work one side , rear leaf opening fitting and tensioning work one side , new pto assembly opening and fitting labour job , pto gear repair work , radiator opening cleaning and fitting work , coolant (castrol/bpcl/iocl) , universal joint new fitting work , engine service charge (with air, oil, fuel filter and labour work (engine oil will be provided by garage) , silencer opening, repairing and fitting work , fly wheel disc fitting work , coupling shaft thread repairing , radiator fan opening and fitting work , propeller shaft opening, repairing and fitting , hub axle repairing , differential repair minor work , hydraulic/oil pipe repair work , shaft bend repairing work , hydraulic steering repair work with tie rod end fitting , steering gear box assembly repair work , steering gear box assembly fitting work , minor arc/gas welding work , dashboard electronic repair work , all censors checking and repair work , vehicle front fibre repair work minor , vehicle front fibre repair work major , hopper body repairing major work with channel , hopper body repairing minor work without channel , hopper body colour green and blue , tripal cover full on both hopper , hydraulic jack new seal kit and fitting work , engine timing belt opening and fitting work , jack foundation repair work , tape repair work , new tape assembly with wiring , cabin complete repair work with colour , cabin seat repair work complete , door lock work , door glass winding mechanism work , complete door repair work with denting and painting , fuel motor opening and fitting work , any sensor opening and fitting work , self repair minor work , self repair major work , controlvalve minor repairlabour job , alternator repair minor work , alternator repair major work , front glasses opening and fitting , wiring set complete work with labour charge , wiring change minor work , hydraulic/ fuel pipe opening fitting , labour job , regeneration/updation work , turbo pipe/egr opening and fitting work , air pressure pipe replace labour job - ?????? ??? ???? ????? ????? ???? ?? tata ??????/?????? ?? ??? ?????? ?????? ??????? ??? ????????? ????? ???? ?????? ?? ?????? ?? ?????? ?? ???? ?? ??? ?? ?????? ?? ??????
Tender For repair and service of vehicle tata mob 207 - service and repair of tata mobile vehicle no 725a , a.supply and change shocker absorber , b. m and l road spring leaf one inch twenty three front bush kit centre bolt u bolt rakab tubing lathe work and welding complete , c. main pipe , d.disc set 04 piece , e. wheel cylinder assy , f. head lamp rh rhd auto lev , g. head lamp lh rhd auto lev , h. wiring hearness main bs-ii , j. wiring hearness egr ctrl bs-ii , k. tmgo diesel engine oil ci4 plus 15w40 , l. fuel paper element bs 1 or 2 or 3 or 4 , m. starter motor bs 1 or 2 or 3 or 4 , n. supply and change front bush kit ball joint road king juping road with welding with lath work bush press fitting , o. replacement of stering pipe , p. assy filter element winger bs 1 or 2 or 3 or 4
Tender For supply, installation, testing and commissioning of single phase metal clad weldingsocket a s per the detailed technical specification attached. warranty: 1 year. [ warranty period: 12 months after the date of delivery ]
Tender For tender for supply of lv7/tmb 9320-000087 rubber mounting left and right (for front eng suspension) , lv7/tmb 2574-4215-0115 brake shoe with lining std , lv7/tmb 1460-362-457 pressure control valve , lv7/tmb 2632-4391-0173 repair kit spring brake actuator t20/24 , lv7/tmb 2632-3240-0103 assy first leaf with bush , lv7/tmb 2574-4600-0115 assy ball joint , lv7/tmb 2525-2340-0113 seal kit , lv7/tmb 2751-1540-0113 ce bracket assy , lv7/tmb 2786-1399-9917 minor repair kit air compressor , lv7/tmb 2614-3240-3203 centre pin , lv7/tmb 2576-7250-0124 assy window regulator rh , w-5 iwe-0015 benches truck welding 1524 mm 60 long x 609.6mm 24