Web Analytics Made Easy - StatCounter

Wood Shutter Tenders

Get complete information related to latest Wood Shutter Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Wood Shutter Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Wood Shutter Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :43410173 Due date: 09 Jan, 202609 Jan, 2026 6.36 Lacs
Tender For supply of material and machinaries for construction of a kitchen at kokatanur thota school, a kannada junior primary school in ramatirtha village - pvc pipe of 4kgcum75 mm morb35, ceramictiles 30x 30 cms morb25, atn36 providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on10mm thick cement plaster, atn26 providing and removing centering, shuttering, strutting, propping etc., and removal ofform work for chejja, atn30 providing and fixing in position fully panelled matti / nandi wood shutters for doors, stylesand rails of 30mm. thick with bottom and lock rails 180mm wide top rail and styles 100mm wide as perdrawing and panels of 20mm thick including cost of materials, labour, hom of machineries complete asper specifications. ( excluding cost of fixtures ), atn46 providing and placing on terrace, polyethylene water storage tanks with manhole lidand suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flowpipes, including cost of all materials, labour, transport charges, hom of equipments and testingcomplete as per specifications.(for 1000 litre capacity) as per is 12701 1996. specification no.kbs13.22, atn39 providing and finishing external walls in two coats with waterproof cement paint ofapproved brand and shade to give an even shade after throughly brooming the surface to remove all dirtand loose powdered material, free from mortar drops and other foreign matter cost of materials, labour,complete as per specifications., atn22 burnt bricks class 35 (non modular), atn13 rubble stones, atn29 providing matti / nandi wood frames of doors, windows, clerestory windows, ventilatorsand other frames, wrought, framed or assembled including making plaster groves ( excluding cost ofcement concrete and side clamps ), but including cost of materials, labour, hom of machineriescomplete as per specifications., atn28 providing and removing centering, shuttering, strutting, propping etc., and removal ofform work for roof slab, atn25 providing and removing centering, shuttering, strutting, propping etc., for beams, at22.binding wire, at21.tmt bars fe 500, atn-12.bond stone 20 x 20 x 45 cm, atn-9.portland cement, atn-8.broken stone aggregate 12 mm to 10 mm size, atn-16.hom of vibrator 0.71 days, atn-15.plasticizer / super plasticizer, atn-14.mixer (concrete small used in culvert), atn-10.mixer (concrete) - 1 cum capacity, atn-7.broken stone aggregate 20 mm size, atn-6.broken stone aggregate 40 mm size, atn-2.coarse sand (zone iii), providing and installing of pre painted galvalume iron trapezoidal profiled sheet, providing and fixing in position brass bib cock of approved quality 20mm nominal bore, providing and fixing to wall, ceiling and floor, medium density polyethylene pipes 6.00 kgf/sq.cm, fabricating, supplying and erecting m.s. tubulartruss, providing and fixing in position black cuddapah slab / shahabad slab / thandur blue slab 4 cms thick, providing and fixing glazed vitrified tiles of approved make, quality and colour of size 600x600x10mm thick, providing and fixing in position in cement concrete steel glazed windows and ventilators side hung/top hung fully openable as per approved drawings, providing and applying two coats dry distemper of approved brand, and shade on wall surface including priming coat and whitening after throughly brooming the surface to remove all dirt, dust, mortar drops and other foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour, complete as per specifications, providing and removing centering, shuttering, strutting, propping etc., for columns, pillars, post and struts, square / rectangular / polygon in plan including cost of all materials, labour complete as per specificaiton

corporations/Associations/Others

CTN :42485358 Due date: 12 Jan, 202612 Jan, 2026 55.80 Lacs
Tender For corrigendum : supply of digital radiography system type c (qty:10) - digital radiography system 50kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the

corporations/Associations/Others

CTN :42485371 Due date: 12 Jan, 202612 Jan, 2026 75.33 Lacs
Tender For corrigendum : supply of digital radiography system type b (qty:10) - digital radiography system 80kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the
 Loading, Please wait...

Connect us via What's Up