Get complete information related to latest Gooty Andhra Pradesh Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gooty Andhra Pradesh Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gooty Andhra Pradesh Tenders.
Tender For supply of kit for driver direct brake valve fd-1 kit as per ftrtipl part no.790004105 and d&m part no.r k ab3-31 consisting of 6 items. find attached document. [ warranty period: 30 months after the date of deliver y ] diesel stores depot/gy, scr andhra pradesh electric loco shed/bza, scr andhra pradesh
Tender For supply of overhauling kit for control portion bc (787802-1994) of kb make ccb system to kbi kit no.xki/k it/02457. set consists of 24 items(31 nos) (kit details as per attached document). [ warranty period: 30 month s after the date of delivery ] diesel stores depot/gy, scr andhra pradesh electric loco shed/bza, scr andhra pradesh
Tender For supply of 36w yes 3 star 2425 for 36w with 6500 k g-13, brand: crompton or equivalent, category name: fluorescent lamps (fluorescent tubular lamps) as per is:2418 (part: 1,2,3 & 4).
Tender For supply of cs 24-100-200g metallic organic standard (75 cst hydrocarbon oil), qty:200 gms suitable for spectroil q100 machine. make: petrolabs or equivalent of same standard.
Tender For supply of set of retaining ring (pivot ring & housing ring) for housing of traction bar. set consisting of two i tems. (1) pivot ring as per clw drawing no.1209.01.313-005 alt-1, qty- 04 nos. (2) housing ring as per clw drawing no.1209.01.313-004 alt-1, qty- 04 nos. [ warranty period: 30 months after the date of delivery ] diesel stores depot/gy, scr andhra pradesh
Tender For corrigendum : request for proposal (rfp) for "design, supply, erection, testing and commissioning of traction sub-station (tss), sectioning posts (sps) and subsectioning and paralleling posts (ssps) in 2x25kv at system with scott-connected transformer on gooty-dharmavaram section" as a part of "upgradation of existing 1x25kv system to 2x25kv at system of south central railway on engineering, procurement &construction (epc) mode