Tender For corrigendum : deep drilling of 125 mm diabore hole by using odexmethod including providing,installation, testing,commissioning of mark–iihand pump and constructionof platforms at pyt. uppergharota-b, w. no. 07, villagesobka nho pritam lalsharma in nagrotaconstituency of districtjammu on turnkey basis(epc) under cdf (2025-26)
Tender For construction/covering of approach passage/lane near laxmi narayan hall, gandhi nagar, ward no 21, jammu ac bahu. ( by wayoff stainless steel 304 (grade)18mm thick polycorbonate sheet )
Tender For corrigendum : as per boq - deep drilling, development & stabilization of 200 mm dia mini tube well (on epc mode) by odex method alongwith providing, installation, testing & commissioning of submersible pump set at shree raghunath ji sanskrit mahavidyalaya, birpur in district samba under dmft/pmkkky (2025-26)
Tender For corrigendum : deep drilling of 125 mm dia bore hole by using odex method including providing, installation, testing, commissioning of mark–ii hand pump and construction of platforms at w. no. 01 moh. ghara nho narinder kumar, joginder sharma and others village mansar pyt. mansar block majalta in district udhampur on turnkey basis (epc) under mplad (2026-27)
Tender For corrigendum : as per boq - deep drilling, development & stabilization of 200mm dia mini tube well (on epc mode) by odex method at govt. nursing college akhnooor, in district jammu under ut capex (deposit) 2025-26
Tender For corrigendum : as per boq - construction of 03 no. 200mm dia. production tubewell (on epc mode) by suitable method of drilling i.e. (reverse/direct/percussion) including providing & installation of submersible pump set of suitable capacity at along the service roads of various dcbs in aor of 69 rcc/35 brtf/project sampark in j&k (ut) in district kathua under mh 8443-deposit gref (2025-26)
Tender For design supply, installation, testing and commissioning of 01 no 10 passenger capacity lift for ram mandir purani mandi along with the allied works including comprehensive annual repair and maintenance of the lift for a period of 02 years post dlp of 01 year