2Hydrographic survey of the Feeder Canal from RD 0.00 to RD 124.00, at mentioned zones, including areas of downstream of Head regulator and that of bank portion upto both left and right bank inspection of Feeder Canal during the year 2019-20
3Hydrographic survey of the Feeder Canal from RD 0.00 to RD 124.00, at mentioned zones, including areas of downstream of Head regulator and that of bank portion upto both left and right bank inspection of Feeder Canal during the year 2019-20
4Hydrological survey of pond of river Ganga including topographical survey of char land, bundhs and low bank in upstream of Farakka Barrage upto 12.00 km and at downstream upto 8.00 km of Farakka Barrage from Barrage axis as per direction of EIC
5Hydrological survey of pond of river Ganga including topographical survey of char land, bundhs and low bank in upstream of Farakka Barrage upto 12.00 km and at downstream upto 8.00 km of Farakka Barrage from Barrage axis as per direction of EIC
6Special repair and renovation of Water Treatment Filter Plant building including boundary wall and fencing around main reservoir at Farakka Barrage Project.
10Special protection work for canal bank in between RD 40.25 to RD 40.60, RD 44.90 to RD 45.10, RD 46.50 to RD 46.75 and RD 53.50 to RD 53.70 in the left bank of Feeder Canal. Total working length 350.74 m