1Rectification of black spots at km 119.3 Amtala km 119.745 Hosenabad km 121.25 Dharma and km 125.5 Keranichoti of NH 60 under NH div-II in the dist. of Paschim Medinipur during the year 2019-20 on EPC mode. Job No. 060_WB_2019_20_466
2Stage stg. work on the road stretch btn. km 80 to km 94.50 of NH 117 during the year 2019_20 under NH Divn_I in the Dist of South 24 Pgs. WB on EPC Mode. Job No. 117-WB-2019-20/465
3Stage-strengthening of NH 151 from Km 0/000 to Km 14/064 under Annual Plan 2019-20 (Total Length 14.064 Km) in the state of Assam. (Job No. 151/AS/2019-20/200)
8Emergent Restoration rehabilitation work of Birendra Sasmal setu over river Kangsabati at ch 118.7 of NH60 under Salboni NHSD of NHDiv-II, PW Rds Dte. in the dist. of Paschim Medinipur on item rate mode using SBD.
9Strengthening of existing carriageway from km 32.00 to km 35.00, km 40.00 to km 41.00 and km 64.70 to km 82.32 of NH-116B under N.H.Division No.-II in the district of Purba Medinipur, West Bengal on EPC Mode. (Job No. 116B-WB-2019-20/458).
10Stage Strengthening work from km 22.760 to km 34.00 of NH-117 in the district of South 24 Parganas, West Bengal under NH Division-I during the year 2019-20 on EPC mode.(Job No. 117-WB-2019-20/455)