2Balance civil, electrical and other alied works (3rd phase) in connection with the shifting of WSFL within the campus of Britannia Engineering Limited, Titagarh, 24 Pgs (North).
3shifting of 11kv with LT line along with distribution Sub-station from kotwali ferryghat to pakuria ferryghat road from 6.00 kmp to 13.80 kmp widening & strengthening