5Repair and maintenance to equipment and connected items at STP and Pump House Building, water level indicators, aviation lights, cleaning of RCC of OH Tank, UG Sump and misc connected works at 20 Wing AF Stn under GE AF Bagdogra.
6Repair and maintenance to equipment and connected items at STP and Pump House Building, water level indicators, aviation lights, cleaning of RCC of OH Tank, UG sump and misc connected works at 20 Wing AF Stn under GE (AF) Bagdogra.
7Repairs to AC Sheet, CGI/PGI sheet, false ceiling, roof, chajja and other B / R works at Phase-I, Phase-II, Phase-III, DGCA and Sinha colony at AF Stn Bagdogra under GE AF Bagdogra
8Repairs to AC sheet, CGI/PGI sheet, false ceilng, roof, chajja and other B and R works at Phase-I, Phase-II, Phase-III, DCGA and Sinha colony at AF Stn Bagdogra under GE (AF) Bagdogra.
9Repairs / replacement of joinery and certain misc B and R works in Phase-I, Phase-II, Phase-III, DGCA and Sinha colony of AF Stn Bagdogra under GE (AF) Bagdogra.