2Dismantling , transportation and installation of 1000 mm wide belt conveyor along 105 L.E gallery for depillaring operation at 105 L.E dep panel in U/G at West block of Churcha mine (RO).
6Dismantling /transportation of existing 1000mm double drive drum with loop take up and Installation of 1200 size double drive drum with loop take up along C-8 Belt in U/G at West block of Churcha mine (RO).
7Transportation of safety materials like roof bolt, cement capsule, bearing plates, nuts, steel, cogs, steel/wooden props, wire nuts, w-straps and sand cartridge from surface to site of working districts of Katkona 1 and 2 Incline.
8Dismantling of drive head ,belt structure ,tailend and belt conveyor of 6L.E-20 X to 41X and transportation to-1L.E panel in seam II of Katkona 1 and 2 Incline