1Engagement of Contractual (hired) 02 number of school buses (seating capacity 52 nos. and not older than 06 years) for transportation of school children from SCW to different school as per route chart given in NIT
2Transportation of Iron and Steel materials from Sail Durgapur stock yard and BEFW Mugma , ECL to Sodepur Central Workshop , ECL as per requirement mentioned in BOQ.
3Engaging outside contractual agency for different types of jobs at Fabrication Shop of Neamatpur Central Workshop on regular basis except Sundays and Holidays for a period of one year (301 days)
6Construction of brick walls for supporting the wide galleries at shaft level, 4L and 14L close to the main haulage line at 1WD of no 7 pit , Nimcha Colliery
7Transportation of Coal from tippler to ground stock, Kalidaspur Project/ MS Siding and loading and transporting from Ground stock to MS Siding for a period of one year
9Diversion, extension of 3.3kV feeder-02 O.H. line near erection yard for feeding power to newly installed transformer for street light in and around Dragline erection yard.