1Annual contract of rewinding and repair work of LT motors of main plant area (including river water system and CHP area) of Unit 1,2,3 and 4 (4X250MW) Stage-I, Phase-I and II, CTPP,
2Annual maintenance contract for Routine, Breakdown and Capital maintenance of Bottom Ash Handling System of Unit 1,2,3 and 4, (4x250MW), Stage-I, Phase-I and II, CTPP,
3Annual contract of operation and maintenance of 500MT RCC main silo system and weigh bridge of Unit 1to 4 and management of ash bulkers of unit 1 to 4, CTPP, Chhabra
8Annual contract for Routine, Breakdown, Capital maintenance and operation work of Air Compressor Atlas Copco make, Air Drying Plant (Refrigerant) Trident / Delair make, and associated equip. of Unit 1,2,3, 4 of Stage-I, Phase-I and II, CTPP, Chhabra
10Annual contract for repair / reconditioning of various components installed at Ash Handling Plant, DM plant, CW/ACW Plant, Fire Fighting system, 4 Nos. RCC Silo (Cap 500MT) and SS Tubes after coolers and inter cooler of AHP Unit 1 to 4, CTPP, Chhabra