2DESIGN AND CONS OF 130 MTR SINGLE SPAN PSC BALANCED CANTILEVER TYPE SUPERSTRUCTURE BRIDGE ON SUITABLE FOUNDATION DULY PROOF CHECKED OF DESIGN AND DRAWINGS INCLUDING CONDUCTING AND SUBMISSION OF SSI REPORTS OVER LACHUNG-CHU RIVER AT KM 0.650 on LZK rd
3HIRING OF HMP OF MINIMUM CAPACITY OF 20/30 TPH INCLUDING GEN SET WITH OPERATOR AT KM 3.50 ON CHANGU NACHOK TAMZE ROAD UNDER 129 RCC 758 BRTF PROJECT SWASTIK IN THE STATE OF SIKKIM
4HIRING OF HMP OF MINIMUM CAPACITY OF 20/30 TPH INCLUDING GEN SET WITH OPERATOR AT KM 3.50 ON CHANGU NACHOK TAMZE ROAD UNDER 129 RCC 758 BRTF PROJECT SWASTIK IN THE STATE OF SIKKIM
6HIRING OF TWO NUMBERS HYDRAULIC EXCAVATOR 20 TON CAPACITY WITH ROCK BREAKER ATTACHMENT AND OPERATOR FOR FORMATION WORK BETWEEN KM 1.90 TO KM 8.78 ON SANKLANG-TOONG ROAD UNDER 107 RCC/758 BRTF IN PROJECT SWASTIK IN STATE OF SIKKIM
7SUPPLY AND STACKING OF VARIOUS SIZES OF STONE AGGREGATES, COARSE SAND FOR PMT AND SURF WKS ON GANGTOK-CHUNGTHANG ROAD UNDER 107 RCC 758 BRTF PROJECT SWASTIK IN STATE OF SIKKIM
8SUPPLY AND STACKING OF CRUSHED STONE AGGREGATES OF VARIOUS SIZE AND COARSE SAND (DRY) BETWEEN KM 18.00 TO KM 38.00 FOR GSBC WORK, SUPPLY AND STACKING OF CRUSHED STONE AGGREGATES OF VARIOUS SIZES AND STONE DUST (DRY) AT KM 38 (WMM PLANT SITE) AND SUPPLY AND STACKING OF CRUSHED STONE AGGREGATES OF VARIOUS SIZES AND STONE DUST (DRY) AT KM 25 (HMP SITE) FOR DBM AND BC WORKS ON RISHI-RONGLI-KUPUP ROAD UNDER 130 RCC/764 BRTF IN PROJECT SWASTIK IN THE STATE OF SIKKIM