3Excavation of trench garland drain in all kind of soil by mechanical hydraulic excavator within mine premises cleaning of garland drain 1.50 km cutting of garland drain 330M to prevent mine from inrush of water Sohagpur Area
5B.T. Renewal work on Shivpur to Talkesri road Ch. 3500 to 5200 M. 1st Call, PAC Rs. 18.62 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 60 days.
7Survey Investigation and Necessary Construction work required for Retrofitting of Existing piped water supply schemes of 03 villages namely (1) Bhamhori kalan (2) Kumbhawad (3) Banwari of Block Pipariya Distt
9Repair of Bridge and Culvert with damage approach different roads of Hoshangabad Sub Dn. 1st Call, PAC Rs. 19.00 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 120 days.
10Repairing of roads at Babai Section under AR. 1st Call, PAC Rs. 19.66 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 120 days.