1Construction of RCC Bridge over Nefatula river near A M C Senior Madrassa on Bilbari L.P. School to Nayagram road for Conversion to RCC Bridges under Mahabir Lachit -Chilarai Setu Nrman Abhijan under RIDF XXV of NABARD for the year 2019-20
2Reconstruction of Breached embankment at Kabaribond village alongwith improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
5Special repair and restoration of damaged stretches of NH-44 from Ch.230/200kmPoamara to ch..247/000kmBotiyaT 16.80 km under SOPD 2018-19 under PWD Karimganj NH division in the state of Assam
6Special Repair and restoration of damaged Stretches of NH-44 at Tinnakhal from Ch.260/109 km to ch.261/761 km and at Dengarbond from Ch.271/000 km to Ch.273/000kmT 3.652 km under SOPD 2018-19 under PWD Karimganj NH division in the state of Assam
7Maintenances /Filling of Potholes and patch reparing of Road pavement with 50mm BM and 30mm BC from km 318 to Km357 in stretches of NH-37 under SOPD for the year 2018-19 under Karimganj NH Division.
Agency :
Assam Industrial Infrastructure Development Copr.