1Repair and maintenance of qtr. No. B 65 occupied by Mr. Devendra Singh Thakur, Sr. Surveyor at Basant Vihar Colony and qtr. No. B 13 occupied By Mr. Asish Kumar Tiwari at Ashok Vihar Colony under Ashok OCP, Piparwar Area.
3Repair and maintenance of qtr. No. B 175 and B 168 occupied by Shri. Haidar Ali, Cat I and Shri. Islam Ansari, D. Operator at Basant Vihar Colony under Ashok OCP, Piparwar Area.
6Miscellaneous part repair workat qtr. No.B 18,B 112,B 90, B 93, B 65, MQ 335, MQ 73, MQ 304, MQ 02, MQ 366, Block No. B 163 to170,B 195 to 202 and B 91 to 106 at Basant Vihar Colony under Ashok OCP , Piparwar Area.
7Supply of drinking water from BOCM filter plant to Rajdhar and Thethangi village by tractor with 5000 ltr capacity water tanker for a period of 06 months under Ashok OCP.
8Regular cleaning and maintenance of 14 nos. Weigh bridges located at different places at Ashok mines, erstwhile Piparwar mine, RCM Siding and Rajdhar Siding for a period of 12 months under Ashok Project.
9Supplying of sand to be used as stemming material in blasting of OB and providing fixing of sand filled bages at suitable places including filling of empty bages for muffling the blasting for control of fly rocks and controlled blasting all complete
10Suppression of dust by spraying water through tanker on road surface from destination CHP CPP office to destination pilot mine CTR junction via CISF camp, bahera Railway crossing, railway RCC underpass, billari Basti SHAJ road etcas shown in the rout