2Construction of 21 Nos. RCC Sectionalisation stopping at 20LE district and dip side Galleries of Eastern part of seam 0 including material cost at Rehar UG mine of Bishrampur Area.
3Construction of 21 Nos. RCC Sectionalisation stopping at 20LE district and dip side Galleries of Eastern part of seam 0 including material cost at Rehar UG mine of Bishrampur Area.
4Construction of 28 Nos. Ventilation stopping in 23 Dip Panel (55L to 70L in between 22D and 23D) 23D (54L-55L),8D,9D Between 52L and 53L and 53L,54 L Between 9D and 10D at Nawapara U.G.Mine.
5Hiring of Payloader and Tippers for loading and transportation of coal from Bhatgaon Colliery stock yard heap No. -1A to feeder breaker of Bhatgaon CHP
8Construction of STP of 0.75 MLD capacity based on SBR Tech and Sewage Network System from Colony to STP i/c surveying, planning,designing, drawing, testing,commissioning,trailrun and O and M for 04 yrs at Kumda Colliery of Bishrampur Area on TURN-KEY