3PROVN OF 04 NOS OF SUMPS SIZE 1.2M x 1.2M DEEP ALONGWITH SUCTION SUBMERSIBLE PUMP ALONGWITH 02 NOS RCC RECHARGE WELLS 3.5M DIA AND 9M DEEP AT KLP ANUPGARH UNDER GE (AF)
4Routine / Breakdown /capital maintenance work of raw water pumps, intake pumps, potable pumps, colony drinking pumps at colony , associated L.P. piping and up keep of the surrounding area of 6X250MW, Suratgarh Thermal Power Station, stage-I,II,III and IV Suratgarh.
5Removal and transportation of dry wet ash from AHP and cleaning of 0 mtr D Row to Chimney Boiler area different floor of ESP Control Room of unit I to VI stage I to IV STPS RVUNL Suratgarh
6Removal and transportation of dry wet ash from AHP and cleaning of 0 mtr D Row to Chimney Boiler area different floor of ESP Control Room of unit I to VI stage I to IV STPS RVUNL Suratgarh