1Upgradation, Reengineering, development of Building Management system at Station and OCC/SHPK including graphic, Data base management, logic development of ECS/ TVS system and designing of ECS/TVS/OCC Mode tables.
9Detailed Design Engineering of Overhead Equipment (FOCS – Flexible Overhead Contact System) at design speed of 180 kmph for Design, Supply, Installation, Testing and Commissioning of Receiving Sub Stations [including 25 kV AC Traction cum 33 kV Auxiliary Main Sub Stations], Extra High Voltage & High Voltage cabling, 25 KV Overhead Equipment (FOCS/ROCS), Auxiliary Power Supply [including Auxiliary Sub Station], SCADA Systems, Operational Control Centre and Associated works on Viaduct & Tunnel for Delhi – Ghaziabad – Meerut RRTS Corridor of NCRTC (Lot 1 & Lot 2)