8Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches
9Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches