Construction Of A Pyramid-shaped Stack Of Approximately 15,000 Quintals Of Bagasse At The Designated Location Within The Mill Premises, Utilizing Own Resources And Labor (one Stack).
CTN :45364506 Co-Operative / Najibabad - Uttar Pradesh