Web Analytics Made Easy - StatCounter

Tender for Annual Rate 2026-27 Rates Of Supplying, Stacking Bituminious Materials And Labour Work On Various Roads Of Uchchhal Taluka Dist- Tapi.- Providing & Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99% By Weight Of Mix For Mixing And 2.5kg/10 Smt Asphalt Vg-30 For Ack Coat & Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Manual Laying Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fire Wood, O Kerosene Labour Charges Etc. Complete Using Contractor's Own Machinaries, Drum Mix Plant And Mannual Finish Etc. Complete (manual Laying) , Providing & Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99% By Weight Of Mix For Mixing And 2.5 Kg/10 Smt Asphalt Vg-30 For Ack Coat & Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Laying With Paver Finisher Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fin Wood, Oil, Kerosene Labour Charges Etc. Complete Using Contractor's Own Machinaries, Drum Mix Plant And Paver Finishe Etc. Complete. (paver Finish) , Providing, Laying & Rolling 37.5 Mm Compacted Thick B.m. In On Mayer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Tack Coat At The Rate Of 2.5kg/10sqm And Using Bitumen Vg10 For Mixing With Aggregate At The Rate Of 3.4% I.e. 34kg/m.t. Of Total Mix Including Heating And Mixing In Drum Mix Plant And Transporting Spreading The Same By Manual Laying And Cosolidation With Vibratory Roller Including Mecessary Firewood, Oil, Lubricants, Labour Charges, Using Contractor's Own Drum Mix Plant, Machineries And Eqipment, Tools Etc.complete In Accordance With The Requirement Of Specification. (manual Laying) , Providing, Laying & Rolling 37.5 Mm Compacted Thick B.m. In On Mayer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Took Of Of The Roto Of 3 Elg/10cgmonducing Bitume , Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36% By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Manual Laying And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene, Fire Wood Labour Charges Etc Comp.with Contractor's Own Machineries And Equipment Tools Etc. Complete In Accordance With The Requirement. (manual Laying) , Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36% By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Paver Finsiher And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene, Fire Wood Labour Charges Etc Comp.with Contractor's Own Machineries And Equipment Tools Etc. Complete In Accordance With The Requirement. (paver Finish) , Providing & Laying Seal Coat With B.t. Agg. As Specifed Using Agg. At The Rate Of 0.24 Cu.mt/10sq.mt.and Bitumen Vg-30 For Mixing Agg. At The Rate Of 4.50% I.e. 45.00 Kg/m.t. And 2.5kg/10 Smt Asphalt Vg-30 For Tack Coat Including Heating & Mixing In Hot / Drum Mix Plant & Transporting & Spreading The Same By Manual Laying & Consolidation With Vibratory Roller Incl. , Necessary Firewoood, Oil, Lubricants, Labour Charges Etc in Tapi - Gujarat

Tender Details
Reference # :
45366425
Description :
Tenders for Annual Rate 2026-27 Rates Of Supplying, Stacking Bituminious Materials And Labour Work On Various Roads Of Uchchhal Taluka Dist- Tapi.- Providing & Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99% By Weight Of Mix For Mixing And 2.5kg/10 Smt Asphalt Vg-30 For Ack Coat & Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Manual Laying Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fire Wood, O Kerosene Labour Charges Etc. Complete Using Contractor's Own Machinaries, Drum Mix Plant And Mannual Finish Etc. Complete (manual Laying) , Providing & Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99% By Weight Of Mix For Mixing And 2.5 Kg/10 Smt Asphalt Vg-30 For Ack Coat & Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Laying With Paver Finisher Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fin Wood, Oil, Kerosene Labour Charges Etc. Complete Using Contractor's Own Machinaries, Drum Mix Plant And Paver Finishe Etc. Complete. (paver Finish) , Providing, Laying & Rolling 37.5 Mm Compacted Thick B.m. In On Mayer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Tack Coat At The Rate Of 2.5kg/10sqm And Using Bitumen Vg10 For Mixing With Aggregate At The Rate Of 3.4% I.e. 34kg/m.t. Of Total Mix Including Heating And Mixing In Drum Mix Plant And Transporting Spreading The Same By Manual Laying And Cosolidation With Vibratory Roller Including Mecessary Firewood, Oil, Lubricants, Labour Charges, Using Contractor's Own Drum Mix Plant, Machineries And Eqipment, Tools Etc.complete In Accordance With The Requirement Of Specification. (manual Laying) , Providing, Laying & Rolling 37.5 Mm Compacted Thick B.m. In On Mayer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Took Of Of The Roto Of 3 Elg/10cgmonducing Bitume , Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36% By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Manual Laying And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene, Fire Wood Labour Charges Etc Comp.with Contractor's Own Machineries And Equipment Tools Etc. Complete In Accordance With The Requirement. (manual Laying) , Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36% By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Paver Finsiher And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene, Fire Wood Labour Charges Etc Comp.with Contractor's Own Machineries And Equipment Tools Etc. Complete In Accordance With The Requirement. (paver Finish) , Providing & Laying Seal Coat With B.t. Agg. As Specifed Using Agg. At The Rate Of 0.24 Cu.mt/10sq.mt.and Bitumen Vg-30 For Mixing Agg. At The Rate Of 4.50% I.e. 45.00 Kg/m.t. And 2.5kg/10 Smt Asphalt Vg-30 For Tack Coat Including Heating & Mixing In Hot / Drum Mix Plant & Transporting & Spreading The Same By Manual Laying & Consolidation With Vibratory Roller Incl. , Necessary Firewoood, Oil, Lubricants, Labour Charges Etc
Ownership :
Sector :
Tender Values
Value :
51,114
EMD :
50,000
Doc. Cost :
1,500
Important Dates
Due date :
05 Jun, 2026
Open date :
05 Jun, 2026
Publish date :
29 May, 2026
Location
Location :
Tapi - Gujarat ( IN )
Connect us via What's Up