Description :
Tenders for Annual Rate 2026-27 Rates Of Supplying, Stacking Bituminious Materials And Labour Work On Various Roads Of Songadh Taluka Dist- Tapi- Providing & Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99% By Weight Of Mix For Mixing And 2.5kg/10 Smt Asphalt Vg-30 For Tac Coat & Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Manual Laying Including Rolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fire Wood, Oil, Kerosene Abour Charges Etc. Complete Using Contractor's Own Machinaries, Drum Mix Plant And Mannual Finish Etc. Complete. Manual Laying) , Providing & Laying Bituminious Base Course 37.5 Mm Thick Compacted In Single Layer Asphalt Vg-30 Grade At 1.99% By Weight Of Mix For Mixing And 2.5 Kg/10 Smt Asphalt Vg-30 For Tac Coat & Using B.t. Chips Of Required Gradation Including Cleaning And Heating Asphalt, Premix Material By Drum Mix Process In Proper Gradation And Laying With Paver Finisher Including Tolling And Consolidation With 8-10 Tonne Vibratory Roller And Providing All Material Equipment, Tools, And Plants, Fire Wood, Oil, Kerosene Labour Charges Etc. Complete Using Contractor's Own Machinaries, Drum Mix Plant And Paver Finisher Etc. Complete. Paver Finish) , Providing, Laying & Rolling 37.5 Mm Compacted Thick B.m. In One Ayer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Tack Coat At The Rate Of 2.5kg/10sqm And Using Bitumen Vg1 For Mixing With Aggregate At The Rate Of 3.4% I.e. 34kg/m.t. Of Cotal Mix Including Heating And Mixing In Drum Mix Plant And Cransporting Spreading The Same By Manual Laying And Cosolidation With Vibratory Roller Including Necessary Firewood, Oi Ubricants, Labour Charges, Using Contractor's Own Drum Mix Olant, Machineries And Eqipment, Tools Etc.complete In Accordance With The Requirement Of Specification. (manual _aying) , Providing, Laying & Rolling 37.5 Mm Compacted Thick B.m. In One Ayer With B.t. Aggregate As Specified And Using Bitumen Vg10 For Tack Coat At The Rate Of 2.5kg/10sqm And Using Bitumen Vg1 For Mixing With Aggregate At The Rate Of 3.4% I.e. 34kg/m.t. Of Cotal Mix Including Heating And Mixing In Drum Mix Plant And Cransporting Spreading The Same By Paver Finisher And Cosolidation With Vibratory Roller Including Necessary Firewood, Oi Ubricants Labour Charges Using Contractor's Own Drum Mix , Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36% By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Manual Laying And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene, Fire Wood Labour Charges Etc Comp.with Contractor's Own Machineries And Equipment Tools Etc. Complete In Accordance With The Requirement. (manual Laying) , Providing, Laying 25mm Thick Compacted Bituminous Carpet Considering 0.66 Cmt./10smt. Stone Chips For One M.ton As Per Specification, Using The Asphalt At Rate 33.60 Kg/m.ton (i.e. 3.36% By Weight Of Total Mix) For Mixing And Asphalt For Tack Coat At Rate 2.5 Kg/ 10sq.mt. Including Heating And Mixing The Asphalt And Stone Aggregates By Continuous Batching Of Drum Mix Plant And Transporting And Spreading The Same By Paver Finsiher And Consoli-dation With Vibratory Roller With Necessary Equipments Oil, Kerosene, Fire Wood Labour Charges Etc Comp.with Contractor's Own Machineries And Equipment Tools Etc. Complete In Accordance With The Requirement. (paver Finish) , Providing & Laying Seal Coat With B.t. Agg. As Specifed Using Agg. At The Rate Of 0.24 Cu.mt/10sq.mt.and Bitumen Vg-30 For Mixing Ag