Web Analytics Made Easy - StatCounter

Tender for Manufacturing And Supply Of Complete Set Of Inspection Gauges As Per Drawing No. Rdso/t-9003(part) Alt-03 For 10125mm O.r. Thick Web Curved Switches B.g. For 60 Kg (uic) On Psc Sleeper To Drawing No. Rdso/t-6155 For Use In Depot. One Set Consist Of The Following:1) End Template At Actual Toe Of Switch (gauge No. 1)2) Head Width Checking Gauge At 2678mm From Ats, 22mm Head Thickness (gauge No. 2a & 2b)3) Head Width Checking Combined Gauge At 2678mm From Ats, 22mm Head Thickness (gauge No. 2/1)4) Head Width Checking Combined Gauge At 4958mm From Ats, 55mm Head Thickness (gauge No. 3a & 3b)5) Head Width Checking Combined Gauge At 4958mm From Ats, 55mm Head Thickness (gauge No. 3/1) [ Warranty Period: 30 Months After The Date Of Delivery ] ] in Multi City - Multi State

Tender Details
Reference # :
45372345
Description :
Tenders for Manufacturing And Supply Of Complete Set Of Inspection Gauges As Per Drawing No. Rdso/t-9003(part) Alt-03 For 10125mm O.r. Thick Web Curved Switches B.g. For 60 Kg (uic) On Psc Sleeper To Drawing No. Rdso/t-6155 For Use In Depot. One Set Consist Of The Following:1) End Template At Actual Toe Of Switch (gauge No. 1)2) Head Width Checking Gauge At 2678mm From Ats, 22mm Head Thickness (gauge No. 2a & 2b)3) Head Width Checking Combined Gauge At 2678mm From Ats, 22mm Head Thickness (gauge No. 2/1)4) Head Width Checking Combined Gauge At 4958mm From Ats, 55mm Head Thickness (gauge No. 3a & 3b)5) Head Width Checking Combined Gauge At 4958mm From Ats, 55mm Head Thickness (gauge No. 3/1) [ Warranty Period: 30 Months After The Date Of Delivery ] ]
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
19 Jun, 2026
Open date :
19 Jun, 2026
Publish date :
29 May, 2026
Location
Location :
Multi City - Multi State ( IN )
Connect us via What's Up