Description :
Tenders for Tender For Supply Of Equipment / Material , Design, Erection, Testing & Commissioning For Sop To Pump House Constructed At Jakhota (sasan) & Dhanot Under Hpshiva Project W.r.t. Horticulture Development Block Dehra In Electrical Section Adhwani Under Esd Hpsebl No-ii Jawalamukhi, Ed Jawalamukhi. - Supply Part Of Lt Line With Aaac 7/3.15 (0.070 Km) Sasan, Steel Tubular Poles 8 Mtr. Long With Base Plate, Muff For Steel Tubular Pole With Concrete Filling, Aaac Conductor 7/3.15, 55 Sq. Mm ( Includes 3 Conductor Length And Additional 1% Sag (sag, Jumpering And Wastage)), Pvc (1.1 Kv, Ai, Un-armour 3.5 X 35 Sq. Mm, Single Continuous Earth Wire (g.i Wire 8 Swg), Shackle Insulator, D-iron, Stay Set Complete, Stay Wire, Earth Knob, Nuts & Bolts Off Sizes, Aluminium Paint, Red Oxide Point, Supply Part Of Lt Line With Aaac 7/3.15 (0.325 Km) Dhanot, Steel Tubular Poles 8 Mtr. Long With Base Plate, Muff For Steel Tubular Pole With Concrete Filling, Aaac Conductor 7/3.15, 55 Sq. Mm ( Includes 3 Conductor Length And Additional 1% Sag (sag, Jumpering And Wastage)), Pvc (1.1 Kv, Ai, Un-armour 3.5 X 35 Sq. Mm, Single Continuous Earth Wire (g.i Wire 8 Swg), Shackle Insulator, D-iron, Stay Set Complete, Stay Wire, Earth Knob, Nuts & Bolts Off Sizes, Aluminium Paint, Red Oxide Point, Supply Part Of Aug. Of 63 Kva To 100 Kva Distribution Sub-station Sasan, Aluminium Thimble 120 Sq Mm, Lt Cable 3.5 Core 120 Sq. Mm, Surge Arrestor 9 Kv Station, Nuts & Bolts Off Sizes, Pipe Earthing Set, 8 Swg Gi Wire For Earthing, 3-ph, 4-wire Trivector Meter 100/5 A, Supply Part Of Aug. Of 25 Kva To 100 Kva Distribution Sub-station Dhanot, Aluminium Thimble 120 Sq Mm, Lt Cable 3.5 Core 120 Sq. Mm, Surge Arrestor 9 Kv Station, Nuts & Bolts Off Sizes, Pipe Earthing Set, 8 Swg Gi Wire For Earthing, 3-ph, 4-wire Trivector Meter 100/5 A, Erection Part Of Lt Line Sasan, Erection Charges & Transportation Charges Complete In All Respect Of Lt Line, Erection Part Of Lt Line Dhanot, Erection Charges & Transportation Charges Complete In All Respect Of Lt Line, Erection Part Of Aug. Of 63 Kva To 100 Kva Dtr Sasan, Erection Charges & Transportation Charges Complete In All Respect Of Aug. Of 11/0.4 Kv, 63 To 100 Kva Dtr, Erection Part Of Aug. Of 25 Kva To 100 Kva Dtr Dhanot, Erection Charges & Transportation Charges Complete In All Respect Of Aug. Of 11/0.4 Kv, 63 To 100 Kva Dtr