Description :
Tenders for Ktps-v Stage -cam-inspection Removal Of Silt And Debris Deposited Over Bottom Of The Sump For Perfect Seating Of Stop Log Gates And Dewatering Of Sump Before Strainer By Insertion Of Stop Log Gates At Cwph And Lifting Of Stop Log Gates After Completion Of Work Including All Leads And Lifts To Be Finished In Complete Shape As Directed By The Field Engineer.-reg