Description :
Tenders for Providing Of Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-423; L006 During Boat Davit Operation Smoke Observed From Control Transformer In Control Panel Of Boat Davit And Abnormal Noise Observed From Hoisting Gearbox Lim..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-423; L013 Port Blower Of Water Jet Compartment Is Not Getting Start Zero Insulation Measured Suspected Winding Burnt Defect To Be Identified And Rectified And Sys..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-423; L022 Smoke Observed From Ac Control Panel During Operation Di Dr Carried Out By Ss And Observed Contactor Coil And No Nc Switch Burnt Out Contactor Coil And..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-423; L 023 Main Engine Control Battery Charger Is Non Operational Defect Identification Carried Out By Ss And Observed That Control Pcb Is Burnt Same To Be Repair..