Description :
Tenders for Providing Of Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-423; E016 Both Main Sea Chest Strainers Deteriorated And Broken Upper Collar And Lifting Handle Also Up Rooted Sea Chest Strainer To Be Fabricated Alongwith Upper..,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-146; E19 Fabrication Of 07 Nos Boxes For Stowage Of D787 Spares Boxes To Be Fabricated As Per Sample Mat Ss Size 03 X 02 X 02 Feet; Service Provider,repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Icgs C-146; E20 Both Sea Chest Strainers Corroded And Thinned Down Resulting In Excess Accumulation Of Sea Weeds Deteriorated Strainers Cause Insufficient Sea Water Suct..