Web Analytics Made Easy - StatCounter

Tender for Supply Of Under Frame Arrgt For Memu/dmc/3ph To Drg No. 74511059, Alt 'c' Col 1. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : Packing Condition As Per Drg No Icf/j&t/misc-2487 Alt 'b'. The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down. Details For Satge Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item] [ Warrantyperiod: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] in Chennai - Tamil Nadu

Tender Details
Reference # :
45549200
Description :
Tenders for Supply Of Under Frame Arrgt For Memu/dmc/3ph To Drg No. 74511059, Alt 'c' Col 1. Firm Shall Fulfill The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. Special Condition : Packing Condition As Per Drg No Icf/j&t/misc-2487 Alt 'b'. The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down. Details For Satge Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Welding Of Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item] [ Warrantyperiod: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
09 Jul, 2026
Open date :
09 Jul, 2026
Publish date :
09 Jun, 2026
Location
Location :
Chennai - Tamil Nadu ( IN )
Connect us via What's Up