Web Analytics Made Easy - StatCounter

Tender for Interior Finishing Providing And Applying White Cement Based Putty Of Average Thickness 1 Mm, Of Approved Brand And Manufacturer, Over The Plastered Wall Surface To Prepare The Surface Even And Smooth Complete. , Exterior Finishing Wall And Roof Surfaces Finishing Walls With Acrylic Smooth Exterior Paint Of Required Shade : 1. New Work (two Or More Coat Applied @ 1.67 Litre/10 Sqm Over And Including Priming Coat Of Exterior Primer Applied @ 2.20 Kg/10 Sqm) , Cement Concrete (cast In Situ) Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 6. 1:4:8 (1 Cement : 4 Coarse Sand (zone-iii) : 8 Graded Stone Aggregate 40 Mm Nominal Size) Cement Concrete (cast In Situ) Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 6. 1:4:8 (1 Cement : 4 Coarse Sand (zone-iii) : 8 Graded Stone Aggregate 40 Mm Nominal Size) in Ambala - Haryana

Tender Details
Reference # :
45702991
Description :
Tenders for Interior Finishing Providing And Applying White Cement Based Putty Of Average Thickness 1 Mm, Of Approved Brand And Manufacturer, Over The Plastered Wall Surface To Prepare The Surface Even And Smooth Complete. , Exterior Finishing Wall And Roof Surfaces Finishing Walls With Acrylic Smooth Exterior Paint Of Required Shade : 1. New Work (two Or More Coat Applied @ 1.67 Litre/10 Sqm Over And Including Priming Coat Of Exterior Primer Applied @ 2.20 Kg/10 Sqm) , Cement Concrete (cast In Situ) Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 6. 1:4:8 (1 Cement : 4 Coarse Sand (zone-iii) : 8 Graded Stone Aggregate 40 Mm Nominal Size) Cement Concrete (cast In Situ) Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Below Plinth Level And Up To Floor Iv Level: 6. 1:4:8 (1 Cement : 4 Coarse Sand (zone-iii) : 8 Graded Stone Aggregate 40 Mm Nominal Size)
Ownership :
Sector :
Tender Values
Value :
NA
EMD :
NA
Doc. Cost :
NA
Important Dates
Due date :
30 Jun, 2026
Open date :
30 Jun, 2026
Publish date :
26 Jun, 2026
Location
Location :
Ambala - Haryana ( IN )
Connect us via What's Up