Description :
Tenders for Tender For Supply Of Mist Eliminator : -mist Eliminator Box Including 6 Pass Pvc Mist Eliminators And Necessary Supports And Angle Frame As Per Attached Specification And Drawing For Control Building -3 Air Washer , Spray Nozzle Header Bank Assembly Along With Ss Spray Nozzles As Per Attached Specification And Drawing For Control Building -3 Air Washer. , Suction Filter Frame As Per Attached Specification And Drawing For Control Building -3 Air Washer , Pump Drain Line With Flanges And Fittings As Per Attached Specification Sheet For Control Building -3 Air Washer , Pump Suction Line With Flanges And Fittings As Per Attached Specification Sheet For Control Building -3 Air Washer , Pump Discharge Line With Flanges And Fittings As Per Attached Specification Sheet For Control Building -3 Air Washer , Pump Base Frame As Per Attached Specification Sheet For Control Building -3 And Control Building -4 Air Washer. , Suction Gate Valve Of Size 100 Nb As Per Attached Specification And Drawing For Control Building -3 And Control Building -4 Air Washer , Discharge Globe Valve Size 80 Nb As Per Attached Specification And Drawing For Control Building -3 And Control Building -4 Air Washer. , Suction Strainer 100 Nb As Per Attached Specification And Drawing For Control Building -3 And Control Building -4 Air Washer , Discharge Non Return Valve -nrv- 80 Nb As Per Attached Specification And Drawing For Control Building -3 And Control Building -4 Air Washer. , Removal Of The Existing Mist Eliminator Bank , Spray Nozzle Headers , Suction Filter Bank , Pump Suction And Discharge Lines , Its Valves And Strainers , Drain Line And Pump Base Frame And Disposal Of Same To Waste Disposal Facility For Control Building -3 Airwasher. , Fabrication , Installation , Erection Of The Mist Eliminator Bank , Spray Nozzle Headers , Suction Filter Bank , Pump Suction And Discharge Lines , Including Installation Of The Valves And Strainers , Installation Of The Drain Line And Pump Base Frame For Control Building -3 Air Washer , Mist Eliminator Box Including 6 Pass Pvc Mist Eliminators And Necessary Supports And Angle Frame As Per Attached Specification And Drawing For Control Building -4 Airwasher. , Spray Nozzle Header Bank Assembly Along With Ss Spray Nozzles As Per Attached Specification And Drawing For Control Building -4 Air Washer. , Suction Filter Frame As Per Attached Specification And Drawing For Control Building -4 Air Washer , Pump Drain Line With Flanges And Fittings As Per Attached Specification Sheet For Control Building -4 Air Washer. , Pump Suction Line With Flanges And Fittings As Per Attached Specification Sheet For Control Building -4 Air Washer , Pump Discharge Line With Flanges And Fittings As Per Attached Specification Sheet For Control Building -4 Air Washer. , Removal Of The Existing Mist Eliminator Bank , Spray Nozzle Headers , Suction Filter Bank , Pump Suction And Discharge Lines , Its Valves And Strainers , Drain Line And Pump Base Frame And Disposal Of Same To Waste Disposal Facility For Control Building -4 Air Washer. , Fabrication , Installation , Erection Of The Mist Eliminator Bank , Spray Nozzle Headers , Suction Filter Bank , Pump Suction And Discharge Lines , Including Installation Of The Valves And Strainers , Installation Of The Drain Line And Pump Base Frame For Control Building -4 Air Washer