Web Analytics Made Easy - StatCounter

Eastern Railway Tenders - ER Tenders

Get complete information related to latest Eastern Railway Tenders - ER Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Eastern Railway Tenders - ER Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Eastern Railway Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45102265 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of hook pivot pin (with washer 39mm id x 76mm od x 04mm thick 02 nos. & split pin 10mm dia x 71 long 02 nos.) as per rdso drawing no. wd-92081-s-56, item no.-4. [ warranty period: 30 months after the date of delivery ]

CTN :45102266 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of lever inner and outer to drg.nos. emu/m-3-2-068 alt-a col-i=4 nos., col-ii=4 nos. [without nylon bushes wherever applicable ]

CTN :45102267 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of 100 va individual static invertor for laptop / mobile charging point in coaches with dc filter capacitor(just after booster circuit) with rating 450v or more (as per rdso lr no.el/7.4.1 dtd.07-12-2012) to rdso spec. no.rdso/pe/spec/tl/0142-2010, rev.0 type-b. [ warranty period: 30 months after the date of delivery ]

CTN :45102268 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of 2 pair x 0.5 sq. mm switch board pvc indoor telephone cable with copper conductor. confirming to tech. spec. no. g/wir-06/02 of may-1994 [ warranty period: 30 months after the date of delivery ]

CTN :45118244 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of 25mm dia al. alloy coupler to is:1285-(latest) with desgn. 63400 condition t6 (new) of table 2 threads as per table-1 of is- 14763 (latest), with is-14768 part-1 clause 6.3.3 (medium mechanical stresses), clause 6 table 1 s.no. (vi) for temperature classification, clause 6.8.1.4 (protection against dust) and clause 6.9.3 (with declared tensile strength for 10 kg load) and dimensions to is:14768 part-2 (latest). the length of the coupler shall be as per is:14768 part-2 latest fig.102 marked x that is 25 mm long. [ warranty period: 30 months after the date of delivery ]

CTN :45118245 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of sika flex-221 (gray/white) (density 1.17 kg./ltr.) or equivalent in 600 ml sachet pack as perdrg. no.- clw/es/3/0175 (alt.-09) [ warranty period: 120 months after the date of delivery ]

CTN :45118246 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of led based spot light , testing of light fitting shall be carried out as per icf spec. no. icf/elec-933, rev-01 cs-01 and drg. no. icf/std-7-6-035 alt-nil. [ warranty period: 30 months after the date of delivery ]

CTN :45118248 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of fabricated side stanchion for brn wagon to irs drg.no.w/lg-1843 alt-2. [ warranty period: 30 months after the date of delivery ]

CTN :45118251 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of swivel type water connection kit consisting of elbow,base and 'o'ring, dlw drg. no.ske-1028, alt-'d' item 1 to 3. [ warranty period: 30 months after the date of delivery ]

CTN :45118256 Due date: 29 May, 202629 May, 2026 NA
Tender For corrigendum : supply of cable single core - 240 sq-mm.1500 volt. composition class-5, with elastomeric insulation and sheath. colour of sheath-black. packing length 100 mtrs. +/- 5% tolerance. length less than 95 mtrs. will be supplied separately or along with last length of cable. specn./drg. : rdso specification no.: spec/e-14/01 (part- il) : rev ll-february 1993. [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up