Tender For 4 x 125 mw surat lignite power plant, unit 1 to 4, biennial maintenance contract for turbine & its auxiliaries and balance of plant equipment for two years 2025-27.
Tender For biennial rate contract for control and instrumentation systems at surat lignite power plant - 4x125 mw, phase 1 & 2 for a period of two years (2025-27)
Tender For corrigendum : annual rate contract tender for fabrication, dismantling & erection of various steel structural work at lignite, limestone and ash handling system of gipcl-slpp year 2025-26
Tender For corrigendum : biennial rate contract for; package-i: digging, loading, transporting, shifting and unloading of drained bed material from boiler floors and package-ii: accumulation, removal, transporting and unloading spilled ash from esp and boiler floors of power plant to designated locations (year: 2025-2027).
Tender For corrigendum : biennial rate contract (brc) for repair / replacement / strengthening of structures including fabrication, erection, dismantling and miscellaneous structural jobs (without material) for units-1 to 4 boilers for fy 2025-27at gipcl-slpp naninaroli site
Tender For corrigendum : biennial rate contract for handling, mechanical maintenance and housekeeping of lignite handling, limestone handling, milling and conveying system and ash handling system for 2 years period for 4 x 125 mw surat lignite power plant.